14.09.2013 Views

GTP 2.0 - Prime Minister's Office of Malaysia

GTP 2.0 - Prime Minister's Office of Malaysia

GTP 2.0 - Prime Minister's Office of Malaysia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>GTP</strong> <strong>2.0</strong> continues the<br />

work from the previous<br />

three years to enhance the<br />

changes implemented in<br />

rural <strong>Malaysia</strong>.<br />

Initiative<br />

Increase access to<br />

paved / gravel roads<br />

Increase access to<br />

clean / treated water<br />

Increase access to<br />

24-hour electricity<br />

Build and restore<br />

houses for<br />

the rural poor<br />

GtP 1.0 aChIEvEmENts<br />

Despite decades <strong>of</strong> effort by the Government to raise the<br />

quality <strong>of</strong> life <strong>of</strong> all <strong>Malaysia</strong>ns to acceptable levels, rural<br />

<strong>Malaysia</strong>ns continued to do without basic amenities such as<br />

quality roads, clean water and access to reliable electricity.<br />

Rural rakyat have been clamouring for better access to<br />

modern infrastructure, and the RBI NKRA has marshalled all its<br />

resources and efforts in response to these needs.<br />

The RBI NKRA delivered significant outcomes in the<br />

implementation <strong>of</strong> their initiatives in <strong>GTP</strong> 1.0, although<br />

unforeseen circumstances meant it did not meet all <strong>of</strong> its<br />

targets. As a result <strong>of</strong> its initiatives, the NKRA achieved the<br />

following targets for each <strong>of</strong> its main areas:<br />

Achievement (2010-2012)<br />

• Built 3,349.6km (111% <strong>of</strong> target)<br />

• 98.6% <strong>of</strong> Peninsular <strong>Malaysia</strong>’s rural population<br />

• 88.7% <strong>of</strong> Sabah’s rural population<br />

• 82.7% <strong>of</strong> Sarawak’s rural population<br />

• Affects 1.47 million households<br />

• Connected 297,067 homes to clean or treated water (90% <strong>of</strong> target)<br />

• 99% <strong>of</strong> Peninsular <strong>Malaysia</strong>’s rural population<br />

• 87% <strong>of</strong> Sabah’s rural population<br />

• 86% <strong>of</strong> Sarawak’s rural population<br />

• Affects 1.4 million households<br />

• Connected 95,300 homes to reliable electricity (104% <strong>of</strong> target)<br />

• 99.8% <strong>of</strong> Peninsular <strong>Malaysia</strong>’s rural population<br />

• 88.7% <strong>of</strong> Sabah’s rural population<br />

• 82.7% <strong>of</strong> Sarawak’s rural population<br />

• Affects 476,500 households<br />

• Built 53,376 homes (132% <strong>of</strong> target)<br />

• Affects 266,880 households<br />

Although construction <strong>of</strong> basic infrastructure will continue<br />

under <strong>GTP</strong> <strong>2.0</strong>, the first phase <strong>of</strong> the transformation<br />

programme also laid down an important foundation enabling<br />

the RBI NKRA to focus on rural economic development beyond<br />

infrastructure considerations alone.<br />

From this standpoint, <strong>GTP</strong> <strong>2.0</strong> continues the work from the<br />

previous three years to enhance the changes implemented in<br />

rural <strong>Malaysia</strong>.<br />

RBI NKRA DELIVERY PARTNERS<br />

Implementing Agencies<br />

Programme Co-Ordinating Parties<br />

Road<br />

Water<br />

Electricity<br />

Housing<br />

Public Works Department (both federal and state levels)<br />

Department <strong>of</strong> Irrigation and Drainage (stage level)<br />

Public Works Department, Sarawak (Water)<br />

Department <strong>of</strong> Water, Sabah<br />

Water supply operators (state level)<br />

Tenaga Nasional Berhad<br />

Sabah Electricity Sdn Bhd<br />

SESCO Berhad<br />

Ministry <strong>of</strong> Rural Development, Sabah<br />

Ministry <strong>of</strong> Rural Development, Sarawak<br />

Rubber Industry Smallholders Development Authority (RISDA)<br />

FELCRA Berhad<br />

Majlis Amanah Rakyat<br />

Department <strong>of</strong> Orang Asli Aairs<br />

Regional Development Authorities (KESEDAR, KEDA, KEJORA,<br />

KETENGAH)<br />

2012 ovERvIEW<br />

As 2012 was the last year in the first horizon <strong>of</strong> the <strong>GTP</strong>, the<br />

RBI NKRA pushed its partners hard to meet its targets and<br />

fulfil its commitments to the rural rakyat. By any measure, the<br />

NKRA’s accomplishments were commendable.<br />

Ministry <strong>of</strong> Rural and<br />

Regional Development<br />

(KKLW)<br />

Sabah and Sarawak<br />

State Governments<br />

(including UPEN Sabah<br />

and SPU Sarawak)<br />

EPU / ICU / MoF /<br />

PEMANDU<br />

148 Government transformation Programme—Annual Report 2012 Chapter Eight 149<br />

Government transformation Programme—Annual Report 2012 Chapter Eight

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!