NKPI<br />
Road Delivery<br />
Peninsular <strong>Malaysia</strong><br />
Sabah<br />
Sarawak<br />
Water Delivery<br />
Peninsular <strong>Malaysia</strong><br />
Sabah<br />
Sarawak<br />
Electricity Delivery<br />
Peninsular <strong>Malaysia</strong><br />
Sabah<br />
Sarawak<br />
Housing Delivery<br />
Peninsular <strong>Malaysia</strong><br />
Sabah<br />
Sarawak<br />
Target 2012<br />
Achieved up to 31 Dec 2012<br />
1,349.9km 1,553km<br />
462km 520km<br />
455km 555km<br />
433km 478km<br />
201,192 HH 187,567 HH<br />
26,225 HH<br />
68,092 HH 60,398 HH<br />
72,875 HH<br />
78,896 HH<br />
48,273 HH<br />
39,442 HH 41,030 HH<br />
3,037 HH<br />
15,455 HH 15,563 HH<br />
20,950 HH<br />
3,366 HH<br />
22,101 HH<br />
14,565 units 22,085 units<br />
4,105 units<br />
5,243 units 6,380 units<br />
5,217 units<br />
8,698 units<br />
7,007 units<br />
INITIaTIvES<br />
8.1<br />
Increasing access to<br />
paved or gravel roads<br />
The initiatives <strong>of</strong> <strong>GTP</strong> 1.0 were focused on the<br />
delivery <strong>of</strong> rural basic infrastructure to achieve two<br />
long-term goals: improve the quality <strong>of</strong> life <strong>of</strong> rural<br />
<strong>Malaysia</strong>ns and enable greater access to markets<br />
thereby improving economic wellbeing. With a<br />
significant portion <strong>of</strong> <strong>Malaysia</strong>ns living in rural areas,<br />
efforts focused on improving their livelihoods become<br />
all the more significant especially if <strong>Malaysia</strong> is to<br />
attain its vision <strong>of</strong> becoming a high-income nation.<br />
1<br />
Increasing<br />
access to clean<br />
or treated water<br />
THE FOUR MAIN INITIATIVES EXECUTED IN <strong>GTP</strong> 1.0 ARE:<br />
Ensuring<br />
24-hour access<br />
to electricity<br />
3<br />
2<br />
Building and<br />
restoring houses<br />
for the rural poor<br />
152 Government transformation Programme—Annual Report 2012 Chapter Eight 153<br />
Government transformation Programme—Annual Report 2012 Chapter Eight<br />
4