3.2.2 HANS BROGES GADE<br />
Hans Broges Gade is located in the Aarhus` inner city<br />
ring, in a dense neighbourhood composed by block structures<br />
up to five stories high from the early 20th century.<br />
The neighbourhood is on outskirts of the city and the majority<br />
of its buildings has residential use. However some<br />
buildings have mixed use where shops and offices are<br />
located in the ground floor.<br />
In this scenario, the street functions as an important link<br />
between the suburbs and the core of the city. Moreover<br />
there is a pedestrian life from mostly local residents that<br />
use the local commerce.<br />
The purpose of the intervention at Hans Broges Gade<br />
was to improve a bicycle route connecting southern suburbs<br />
of Holme to the centre of the city to become one of<br />
seven main bicycle corridors of the bicycle network plan.<br />
BEFORE AND AFTER<br />
Hans Broges Gade used to be a street with broad lanes<br />
for motorized vehicles and car parking facilities in both directions<br />
just next to the sidewalks. There were only bicycle<br />
tracks at the beginning of the street in the side facing<br />
Marcelis Boulevard for the first 100 meters. Along the rest<br />
of the street, cyclists had to ride their bikes on the outside<br />
of the rows of parked cars together motorized vehicles,<br />
especially busses.<br />
With long blocks of up to 150 metres, cyclists with their<br />
bikes parked in the sidewalk had difficulty to access the<br />
road because of the row of parked cars. During the field<br />
observation several elderly residents mentioned it to be<br />
unsafe to walk on the sidewalks because cyclists preferred<br />
to ride their bikes on them, and consequently becoming<br />
unsafe for the pedestrians.<br />
In order to give space to implement bicycle tracks in both<br />
directions of the street, one of the car parking rows was<br />
removed.<br />
THE COSTS OF HANS BROGES GADE<br />
The construction work of Hans Broges Gade was conducted<br />
between the 1st of December 2009 and the 15th<br />
of July 2010. The construction was delayed for several<br />
months due to a harsh winter and from road construction<br />
diggings for reinstalling main cables.<br />
Aarhus municipality hired the counting firm for Grontmij<br />
Cal Bro to develop the project and manage the construction,<br />
consulting engineers for project design and construction<br />
management.<br />
The overall cost of the project was 2,8 million Danish krones.<br />
At the project end maintenance became part of regular<br />
municipality maintenances with no costs specified.<br />
After the opening, the maintenance costs of the infrastructure<br />
were estimated by the municipalities assumption<br />
costs and there is no information about specific costs.<br />
Figure 3.2.9: Hans Broges Gade view before the intervention, in September 2009. Source: Google street view<br />
Figure 3.2.10: Hans Broges Gade view after the intervention, in September 2010<br />
68 69