RepoR t<br />
57<br />
More room for machining operations was created, enabling the plant to operate with a high degree of<br />
vertical integration and further localize production. Assembly lines were redesigned to cope with high<br />
levels of demand for brake control systems, especially in the mainline segment. Throughput was further<br />
optimized in terms of timing and routing, with alignment of assembly, inspection and packing processes.<br />
And the service area was expanded to 1,400 m 2 in response to growing aftermarket demand. A<br />
new laboratory measuring 350 m 2 was also created to house the so-called System Engineering and<br />
Commissioning Center China.<br />
Environmental aspects were also taken into account in the expansion program, with a rainwater tank<br />
installed for irrigation of the surrounding gardens and solar panels mounted on the roof for hot water<br />
supply. A modern canteen, new locker rooms and showers were also built to take care of the 1,000-strong<br />
workforce.<br />
Rapid growth in Wuxi<br />
The Merak-Jinxin joint venture in Wuxi, which produces air conditioning systems, was also further expanded<br />
in <strong>2010</strong>. Since it was first set up in June 2008, the company has grown its workforce from 10<br />
to 300. During the year under review, high order volumes from the region drove up production to<br />
more than 2,000 on-board HVAC units. To meet such demand, the workshops were expanded, increasing<br />
potential annual output to 2,400 units.