GENERAL COAL MINE INSPECTION PROCEDURES AND<br />

INSPECTION TRACKING SYSTEM <strong>HANDBOOK</strong> CHAPTER 4<br />

Responsibilities.<br />

1. District Manager. The District Manager will:<br />

a) Direct the audit program <strong>and</strong> provide the Administrator with a<br />

report on the audit results;<br />

b) Initiate a Part 50 audit whenever circumstances indicate that it is<br />

appropriate. In all instances, however, a Part 50 audit will be required at mines at<br />

which a chargeable fatality occurred;<br />

c) Ensure that appropriate enforcement action is taken when required by audit<br />

results;<br />

d) Provide applicable data <strong>and</strong> guidance to the auditors; <strong>and</strong><br />

e) Furnish to the auditors documentation that establishes <strong>MSHA</strong> policy or<br />

procedures concerning 30 CFR Part 50 <strong>and</strong> the audit program.<br />

Auditors. Part 50 auditors will:<br />

a) Request an audit package for the mine. There are two alternate methods for this:<br />

1. The audit package can be obtained from the <strong>MSHA</strong> intranet website<br />

http://mshanet.msha.gov/ (hyperlink only accessible when connected to the<br />

<strong>MSHA</strong> network) by clicking on: 1) <strong>MSHA</strong> Report Center; 2) DW Production<br />

Reports; 3) Part 50 Reports; <strong>and</strong> 4) Part 50 Audit Checklist. Questions should be<br />

directed to the Office of Program Evaluation <strong>and</strong> Information Resources (PEIR),<br />

Information Technology Center (ITC), (303) 231-5475; or<br />

2. The computer-generated audit forms can be obtained from ITC. The forms that<br />

cover the preceding 3 years must be requested at least 2 weeks prior to<br />

conducting the audit.<br />

b) Coordinate the audit with the inspector conducting the regular<br />

inspection at the mine being audited;<br />

c) Keep the District Manager informed of all changes in plans, schedules, problems<br />

that arise during each audit, <strong>and</strong> any other factors that could affect the progress<br />

of the audit; <strong>and</strong><br />

d) Have some latitude in determining how the audit will be conducted (e.g.,<br />

number of days <strong>and</strong> scope of review).<br />