28.04.2014 Views

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GENERAL COAL MINE INSPECTION PROCEDURES AND<br />

INSPECTION TRACKING SYSTEM <strong>HANDBOOK</strong> CHAPTER 5<br />

starts timing, with a stopwatch, how long the smoke cloud takes to travel over<br />

the specified distance.<br />

d. If a stopwatch is not available, use a watch with a sweep second h<strong>and</strong>. In this<br />

case, the downstream person should signal for release of the smoke cloud when<br />

the second h<strong>and</strong> reaches a reference point.<br />

e. Record the time interval from the release of the smoke until the leading edge<br />

(front) of the smoke cloud reaches the downstream person. The leading edge is<br />

used because the first part of the smoke should just be leaving the tube <strong>and</strong><br />

starting to travel downstream in the air current when the timing begins.<br />

f. Divide the airway cross section into four quadrants <strong>and</strong> time smoke clouds in<br />

each of the four quadrants. (Refer to Figure 5-2.) Make at least one measurement<br />

at the center point of each quadrant. Make several measurements in each<br />

quadrant for greater accuracy.<br />

Figure 5-2: Section Showing Quadrants (below)<br />

Release 1 (February 2013) 5-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!