28.04.2014 Views

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

MSHA HANDBOOK SERIES - PH13-V-1 - Mine Safety and Health ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GENERAL COAL MINE INSPECTION PROCEDURES AND<br />

INSPECTION TRACKING SYSTEM <strong>HANDBOOK</strong> CHAPTER 6<br />

_____ MSN 014 Respirable Dust Results with Blue Cards Attached (not m<strong>and</strong>atory that<br />

they be signed, but must have a positive identifier of who conducted the sample).<br />

_____ 2000-84 Noise Survey Results.<br />

_____ Results of other samples taken (asbestos, etc.).<br />

_____ 2000-207 Independent Contractor Form (only if new or updated).<br />

_____ 2000-208 Independent Contractor Form (for contractors on mine site).<br />

_____ Impoundment Inspection Forms. (<strong>MSHA</strong> form number is currently being assigned)<br />

_____ 2000-34 Coal Refuse Pile Periodic Inspection Form.<br />

_____ ATF 5030.5 <strong>and</strong>/or ATF 5400.5 ATF Inspection Form.<br />

_____ Diesel Equipment Inventory Records (print out).<br />

_____ SCSRs Inventory Records (print out). Note: 2000-220 form is discontinued.<br />

_____ Part 49 Checklist (<strong>Mine</strong> Rescue Station).<br />

_____ ITS Tracking (print out).<br />

_____ <strong>Mine</strong> Tracking Map(s).<br />

_____First-Line Supervisors E01 Certification Sheet<br />

Release 1 (February 2013) 6-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!