We continue to invest in the following<br />

ongoing projects to reduce air emissions:<br />

Vanderbijlpark Works<br />

• Sinter plant off-gas treatment<br />

project: this project, which is<br />

expected to reduce SO 2<br />

emissions<br />

by 1 500 tonnes per annum and<br />

particulate emissions by 1 000 tonnes<br />

per annum, is on track for completion<br />

in quarter one of 2011. (reduction<br />

figures based on full production).<br />

• EAF dust extraction system: after<br />

the temporary halt reported in<br />

2009, this project is now back on<br />

line. Detailed design is underway<br />

and we expect construction<br />

to be completed by 2013/14.<br />

Once commissioned, this system<br />

is expected to reduce visible air<br />

emissions to a similar extent as<br />

the system currently running at<br />

Vereeniging Works.<br />

• Blast Furnace D stockhouse<br />

baghouse project: this remains on<br />

track for completion by 2012.<br />

• Implementation of various<br />

improvements at the coke batteries<br />

[as per requirements of the National<br />

Environmental Management:<br />

Air Quality Management Act<br />

(NEMEQA)] over the next<br />

five years.<br />

Newcastle Works<br />

• Blast furnace cast house dust<br />

extraction unit improvements: on<br />

track for completion in 2014.<br />

• Desulphurisation facility at steel<br />

meltshop: on track for completion<br />

during May 2011.<br />

• Implementation of various<br />

improvements at the coke batteries<br />

(as per NEMAQA requirements)<br />

over the next five years.<br />

Coke and Chemicals<br />

The coke battery at the old Pretoria<br />

Works is scheduled for a complete<br />

upgrade in order to comply with the<br />

new NEMAQA requirements over the<br />

next 5 years.<br />

CO 2<br />

emissions and their<br />

impact on climate change<br />

CO 2<br />

emissions are a further important<br />

air emissions indicator but, because<br />

of the fact that they are inextricably<br />

linked with issues of energy usage and<br />

climate change, they are dealt with<br />

separately in the chapter on energy<br />

and climate change.<br />

Water usage and pollution<br />

While iron- and steel making requires<br />

large quantities of water, we are<br />

making good progress in reducing<br />

water consumption, with a 37%<br />

absolute reduction being achieved to<br />

date from the baseline of 2005. We<br />

stick firmly to our goal of reducing<br />

water intake by 40% against this<br />

baseline. However, delays on the<br />

project to make Newcastle Works<br />

a ZED facility has necessitated an<br />

extension of the target date from<br />

2011 to 2013 (for more detail view<br />

the project list that follows).<br />

Our total freshwater intake for 2010<br />

was 3.64kl/tonne of liquid-steel<br />

produced which was up on the 3.36kl<br />

of the previous year, due mainly<br />

to increased water usage at our<br />

Vanderbijlpark Works where significant<br />

water quantities had to be used for<br />

rehabilitation projects.<br />

Each production facility draws its<br />

water from a particular source.<br />

Vanderbijlpark Works draws its water<br />

from the Vaal River and Vaal Dam,<br />

Newcastle Works from the Ngagane<br />

River, Saldanha Works from the<br />

municipality and Vereeniging Works<br />

from the Vaal and Klip rivers. The total<br />

water withdrawal per plant is outlined<br />

in the graph below.<br />

Fresh water intake<br />

3.48<br />

3.55<br />

2.14<br />

1.44<br />

3.16<br />

3.95<br />

4.05<br />

1.97<br />

1.75<br />

3.46<br />

3.26<br />

4.63<br />

1.92<br />

2.48<br />

3.33<br />

3.45<br />

3.73<br />

2.17<br />

3.67<br />

3.36<br />

4.18<br />

3.69<br />

2.15<br />

2.87<br />

3.64<br />

kI/tonne crude steel (CS)<br />

Vanderbijilpark<br />

Newcastle Saldanha Vereeniging AMSA<br />

2006 2007 2008<br />

2009 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!