bold spirit - ArcelorMittal South Africa
bold spirit - ArcelorMittal South Africa
bold spirit - ArcelorMittal South Africa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
85<br />
<strong>ArcelorMittal</strong> <strong>South</strong> <strong>Africa</strong><br />
Annual Report 2010<br />
Goals<br />
In the coming year the focus will be<br />
on the following energy efficiency and<br />
CO 2<br />
reduction projects:<br />
• Variable-speed drives<br />
• Electricity generation from waste<br />
process gases and waste heat<br />
• Lighting retrofits and replacement<br />
• Heat recovery – optimisation of<br />
cooling processes, utilisation of<br />
generated process heat.<br />
• Water heating systems – heat<br />
pumps and solar<br />
• Compressed-air systems<br />
(Saving of 1Kwh = saving of 1.03kg<br />
CO 2<br />
) – Eskom Annual report 2010.<br />
The electricity generation and waste<br />
heat recovery projects are both<br />
running over two to three years<br />
and the benefit will only be seen in<br />
the specific carbon emissions after<br />
full implementation. Most of these<br />
projects will only reduce scope II<br />
emissions.<br />
CO 2<br />
emission per source<br />
Coal 70%<br />
Nat gas 3%<br />
Fuel 0%<br />
Electricity 27%<br />
Energy GJ per source<br />
Coal 82%<br />
Nat gas 7%<br />
Fuel 0%<br />
Electricity 11%