16.06.2014 Views

bold spirit - ArcelorMittal South Africa

bold spirit - ArcelorMittal South Africa

bold spirit - ArcelorMittal South Africa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

85<br />

<strong>ArcelorMittal</strong> <strong>South</strong> <strong>Africa</strong><br />

Annual Report 2010<br />

Goals<br />

In the coming year the focus will be<br />

on the following energy efficiency and<br />

CO 2<br />

reduction projects:<br />

• Variable-speed drives<br />

• Electricity generation from waste<br />

process gases and waste heat<br />

• Lighting retrofits and replacement<br />

• Heat recovery – optimisation of<br />

cooling processes, utilisation of<br />

generated process heat.<br />

• Water heating systems – heat<br />

pumps and solar<br />

• Compressed-air systems<br />

(Saving of 1Kwh = saving of 1.03kg<br />

CO 2<br />

) – Eskom Annual report 2010.<br />

The electricity generation and waste<br />

heat recovery projects are both<br />

running over two to three years<br />

and the benefit will only be seen in<br />

the specific carbon emissions after<br />

full implementation. Most of these<br />

projects will only reduce scope II<br />

emissions.<br />

CO 2<br />

emission per source<br />

Coal 70%<br />

Nat gas 3%<br />

Fuel 0%<br />

Electricity 27%<br />

Energy GJ per source<br />

Coal 82%<br />

Nat gas 7%<br />

Fuel 0%<br />

Electricity 11%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!