11.07.2014 Views

Assessment of Conversion Technologies for Bioalcohol Fuel ...

Assessment of Conversion Technologies for Bioalcohol Fuel ...

Assessment of Conversion Technologies for Bioalcohol Fuel ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

comparative purposes, a thermochemical facility producing electricity only. The 5E<br />

factors applied in this quantitative comparison include: product yields (an E1<br />

factor); net energy efficiency (an E2 factor); emissions <strong>of</strong> criteria pollutants and<br />

carbon dioxide (E3 factors); and capital, operating and production costs (E4<br />

factors). Socio-political (E5) factors are less amenable to quantification and thus<br />

are not included in this table.<br />

Table 5–Comparison <strong>of</strong> Thermochemical and Biochemical Systems<br />

Plant Size<br />

DT/day<br />

Products (E1)<br />

A) Thermochemical<br />

<strong>Conversion</strong><br />

Mixed Alcohols &<br />

Electricity<br />

B) Biochemical<br />

<strong>Conversion</strong><br />

Ethanol & Electricity<br />

500 2,205<br />

C) Thermochemical<br />

<strong>Conversion</strong><br />

Electricity Only<br />

500<br />

Ethanol <strong>Fuel</strong> (gallons/DT) 80 59 N/A<br />

Electricity<br />

(kWh/DT)<br />

Total Net Energy<br />

Efficiency (E2)<br />

Plant Emissions (E3)<br />

(lb/MMBTU output)<br />

550 205 1400<br />

50% 33% 28%<br />

NO X 8.58E-03 2.71E-01 1.80E-02<br />

SO X 6.17E-04 5.95E-01 1.56E-03<br />

PM 1.20E-02 7.30E-02 3.17E-02<br />

CO 1.11E-01 2.71E-01 3.13E-01<br />

VOC 2.96E-03 2.30E-02 7.47E-03<br />

CO 2 303 481 694<br />

Economics (E4)<br />

Capital Cost, $M 66 205 60<br />

Operating Cost, $M/yr 14.9 107.0 16.4<br />

Electricity Production Cost<br />

($/kWh)<br />

Alcohol Production Cost<br />

($/gallon)<br />

$0.071 N/A $0.071<br />

$1.12 $2.24 N/A<br />

N/A: Not applicable; E1, E2 and E4 values are given with +15% uncertainty and E3 values are given<br />

with +20% uncertainty<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!