02.10.2014 Views

Annual Report 2010 - Christchurch City Council

Annual Report 2010 - Christchurch City Council

Annual Report 2010 - Christchurch City Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Parks, open spaces<br />

and waterways<br />

<strong>Council</strong> activities and<br />

services<br />

<strong>Annual</strong> <strong>Report</strong><br />

<strong>Christchurch</strong> Otautahi<br />

<strong>2010</strong><br />

p79.<br />

<strong>Council</strong> activities and services<br />

Parks, open spaces and waterways<br />

Activity Level of service Actual Target<br />

Cemeteries (continued) Maintain shrub gardens: • achieved<br />

• achieved<br />

• achieved<br />

• achieved<br />

• achieved<br />

• maintain plants for long–<br />

term display and health<br />

• control weeds within<br />

specification: no flower or<br />

seed heads, and height ≤50<br />

mm.<br />

• mulch to a minimum depth<br />

of 75 mm<br />

• monitor, report and control<br />

plant pests and diseases<br />

• irrigate to an agreed<br />

programme<br />

Maintain toilets, changing rooms<br />

and buildings:<br />

• achieved<br />

• achieved<br />

• service toilets and changing<br />

rooms either 1–3 times<br />

weekly or 1– 2 times daily,<br />

depending on seasonal<br />

demand<br />

• report serious damage or<br />

faults within 24 hours of<br />

notice<br />

Maintain turf areas: • achieved<br />

• achieved<br />

• keep mown areas within 25<br />

mm – 60 mm<br />

• maintain turf in a healthy,<br />

dense, uniform condition<br />

Interment capacity meets the<br />

needs of the city<br />

Response time to burial plot<br />

applications<br />

Reduced from 4.6 years (2,697<br />

plots) to 4.1 years (2,356 plots)<br />

This is on track<br />

Current capacity is 2.2 years<br />

This is on track<br />

All applications for interment<br />

were confirmed within four hours<br />

on each working day of receiving<br />

the application<br />

Burial plots: reduce the number<br />

of available plots to meet the<br />

two year capacity target, by 2014<br />

Ash Plots: reduce the number of<br />

available plots to meet the two<br />

year capacity target, by 2012<br />

All applications for interment<br />

will be confirmed within one<br />

working day of receiving the<br />

application<br />

Customer satisfaction with<br />

maintenance and appearance of<br />

<strong>Council</strong> cemeteries<br />

Customer satisfaction with<br />

<strong>Council</strong> cemetery services<br />

68%<br />

Baseline measure to be<br />

established after two results<br />

100%<br />

Baseline measure to be<br />

established after two results<br />

Establish baseline measure<br />

Establish baseline measure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!