19.10.2014 Views

MicroStrategy 7 Administrator Guide

MicroStrategy 7 Administrator Guide

MicroStrategy 7 Administrator Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Schedule Manager layout<br />

To viewing details, choose Details from the View menu. The Schedule Manager<br />

provides you with the following information about the databases instances defined<br />

for a project source:<br />

I<br />

N<br />

T<br />

E<br />

R<br />

F<br />

A<br />

C<br />

E<br />

Column<br />

Name<br />

Owner<br />

Modification Time<br />

Description<br />

Definition<br />

Name of the schedule<br />

User who created the schedule<br />

Last date and time at which the schedule was<br />

modified<br />

If you included a description in the schedule<br />

definition, it is displayed here<br />

Right-clicking a schedule brings up a menu with the following choices:<br />

• Edit: Opens the Schedule Wizard<br />

• Delete: Deletes the selected schedule<br />

• Rename: Allows you to rename the selected schedule<br />

• Properties: Opens the Properties window for the selected schedule<br />

A right-click anywhere else in the Schedule Manager dialog box brings up a menu<br />

with the following options:<br />

• View: Allows you to change the view<br />

• Refresh: Refreshes the information display<br />

• Events: Opens the Event Viewer<br />

• New: Point to New, then to Schedule to open the Schedule Wizard<br />

118 Chapter 26 Schedule Manager

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!