Exhibit 4K below summarizes the above regulatory cost estimates on an incremental basis (i.e., without including the “Baseline Costs”<br />
estimated in Chapter 3 of this RIA). Appendix J presents regulatory costs estimates <strong>for</strong> each of the 495 electric utility plants.<br />
Exhibit 4K<br />
Summary of Cost Estimates <strong>for</strong> the October 2009 Draft RIA Regulatory Options<br />
($millions in 2009 price level; average annual amortized @7% discount rate over 50-year period 2012 to 2061)<br />
Subtitle C<br />
Subtitle D<br />
Hybrid C&D<br />
RCRA Regulatory Cost Element<br />
Hazardous waste<br />
(version 1)<br />
A. Engineering Controls (onsite): $491 $491 $491<br />
1. Groundwater monitoring $13 $13 $13<br />
2. Bottom liners $95 $95 $95<br />
3. Leachate collection $8 $8 $8<br />
4. Fugitive dust controls $5 $5 $5<br />
5. Water runon/runoff controls $2 $2 $2<br />
6. Financial assurance $30 $30 $30<br />
7. Disposal unit location restrictions $76 $76 $76<br />
8. Closure capping to cover unit $255 $255 $255<br />
9. Post-closure groundwater monitoring $2 $2 $2<br />
10. Storage design & operating standards Not estimated in this RIA Not estimated in this RIA Not estimated in this RIA<br />
B. Other Ancillary Costs: $107 $1 $9<br />
11. For offsite disposal (11a+11b+11c) =<br />
11a. RCRA manifest cost<br />
11b. Added operation <strong>for</strong> hazmat truck<br />
11c. Offsite LF RCRA Subtitle C permit<br />
$77<br />
$66<br />
$8<br />
$3<br />
$0<br />
Not relevant<br />
Not relevant<br />
Not relevant<br />
$0<br />
(offsite applies only to LFs<br />
so no incremental cost over<br />
baseline)<br />
12. Structural integrity inspections $1 $1 $1<br />
13. RCRA facility-wide investigation $7.6 Not relevant $2.4<br />
14. RCRA facility-wide corrective action Not estimated in this RIA;<br />
historical average =<br />
$5.4 million per case<br />
Not relevant<br />
Not estimated in this RIA;<br />
historical average =<br />
$5.4 million per case<br />
15. RCRA TSDF haz waste disposal permit $7 Not relevant $2<br />
16. RCRA en<strong>for</strong>cement inspection $0.06 $0 $0.02<br />
17. Future added cleanup cost as “hazardous waste” Not estimated in this RIA:<br />
case studies indicate possible<br />
$18 to $376 million per case<br />
Not relevant<br />
Not estimated in this RIA;<br />
case studies indicate possible<br />
$18 to $376 million per case<br />
18. EPA paperwork reporting/recordkeeping $13 Not relevant $4<br />
C. Land Disposal Restriction Dewatering Treatment $876 (updated) $876 (updated) $876 (updated)<br />
TOTAL ANNUALIZED COSTS (A+B+C) =<br />
Average cost per-ton (94.2 million tons disposed) =<br />
Average cost per-plant (467 disposing plants) =<br />
$1,474 per year (updated)<br />
($15.65 per ton)<br />
($3.16 million per plant)<br />
$1,368 per year (updated)<br />
($14.52 per ton)<br />
($2.93 million per plant)<br />
$1,376 per year (updated)<br />
($14.61 per ton)<br />
($2.95 million per plant)<br />
Note: Chapter 6 of this RIA scales these cost estimates based on the October 2009 draft RIA options, to the 2010 regulatory options.<br />