Exhibit 4B<br />
Summary of “Ancillary Cost” Estimates Associated with RCRA Regulation of CCR Disposal<br />
($millions average annualized; 2009$)<br />
State Government<br />
Applicability to Electric Utility RCRA-Authorized<br />
Row Total<br />
Cost<br />
Ancillary Cost Element<br />
CCR Regulatory Options Industry Cost Program Cost<br />
11. Ancillary offsite disposal costs Subtitle C $76.35 $0.63 $76.98<br />
12. Impoundment structural integrity inspections Subtitle C and Subtitle D $0.96 $0.054 $1.01<br />
13. RCRA facility-wide investigations (RFIs) Subtitle C $6.9 $0.7 $7.6<br />
14. RCRA facility-wide corrective action Subtitle C Not estimated –<br />
historical<br />
average cost =<br />
$5.4 million per<br />
facility<br />
Not estimated<br />
Not est.<br />
15. RCRA TSDF waste disposal permits Subtitle C $5.8 $22.3 $28.1<br />
16. RCRA en<strong>for</strong>cement inspections Subtitle C $0 $0.063 $0.063<br />
17. Future disposal unit failure cleanup<br />
Subtitle C<br />
Not est. – case Not est. – case Not est.<br />
remediation as RCRA hazardous waste<br />
study example study example<br />
18. EPA administrative reporting & recordkeeping<br />
18a. EPA regulated waste notification<br />
18b. RCRA TSDF general facility standards<br />
18c. RCRA haz waste biennial report<br />
18d. CERCLA RQ reporting<br />
Subtitle C Subtotal= $11.13<br />
$0.005<br />
$9.01<br />
$1.45<br />
$0.0042<br />
Subtotal= $1.81<br />
$0.0008<br />
$1.47<br />
$0.24<br />
$0.0007<br />
$12.94<br />
$0.0058<br />
$10.48<br />
$1.69<br />
$0.0049<br />
Column Totals <strong>for</strong> the three options of the October 2009 draft RIA :<br />
Subtitle C hazardous waste $100.4 $25.6 $126.7<br />
Subtitle D (version 1) $0.96 $0.05 $1.0<br />
Hybrid C&D* $7.9 $7.7 $15.6<br />
* Hybrid C&D costs <strong>for</strong> ancillary cost items 13, 14, 15, 16, 17, 18 are proportioned only to the 158 plants with impoundments that would be<br />
regulated under Subtitle C <strong>for</strong> this option, by the proportionate multiplier: (158 plants w/impoundments) / (495 total plants) = 0.319<br />
82