Exhibit 5A-14<br />

Estimated Number of Electric Utility Plants by CCR Disposal Unit Type<br />

UL A<br />

LF<br />

CL A<br />

LF<br />

UL C<br />

LF<br />

CL C<br />

LF<br />

UL A<br />

SI<br />

CL A<br />

SI<br />

UL C<br />

SI<br />

CL C<br />

SI<br />

50 21 26 7 31 28 68 31<br />

Multiplying the number of facilities in each category from Exhibit 5A-14 above by the percent of facilities requiring remediation in Exhibit<br />

5A-13 above yields the estimated number of facilities that would lead to state or federal clean ups in Exhibit 5A-15 below. <strong>The</strong>se estimates of<br />

the number of facilities requiring cleanup does not account <strong>for</strong> any cleanups resulting from other constituents exceeding a hazard quotient of 1.<br />

Thus, this estimate may under-estimate the total number of cleanups.<br />

Exhibit 5A-15<br />

Number of Electric Utility Plants Requiring Future Groundwater Remediation<br />

Clean Up Level<br />

UL A<br />

LF<br />

CL A<br />

LF<br />

UL C<br />

LF<br />

CL C<br />

LF<br />

UL A<br />

SI<br />

CL A<br />

SI<br />

UL C<br />

SI<br />

CL C<br />

SI<br />

Assuming All Groundwater Is Remediated<br />

1.00E-04 11 4 7 1 17 11 47 18<br />

1.00E-05 23 9 15 3 26 21 60 24<br />

1.00E-06 32 14 21 5 30 26 66 29<br />

Assuming Only Potable Groundwater Is Remediated<br />

1.00E-04 4 1 2 0 6 4 16 6<br />

1.00E-05 7 3 5 1 9 7 20 8<br />

1.00E-06 11 5 7 2 10 9 22 9<br />

With the number of units requiring remediation, EPA estimated the cost of groundwater remediation under the baseline and each regulatory<br />

option presented above. Groundwater remediation costs were estimated in two steps. First, EPA assumed contamination that might occur at<br />

sites in states with more stringent monitoring requirements, would be discovered promptly. This suggests that there is likely to be less<br />

remediation required than at the typical site. Thus, EPA assigned these sites the 25 th percentile remediation costs displayed in Exhibit 5A-16<br />

below as the midpoint of the bottom half of costs. <strong>The</strong>se future remediation events were spread evenly across all 75 years of the analysis.<br />