9. Post-closure monitoring requirements<br />
Of the 34 state regulations reviewed, 11 states require immediate compliance with post-closure groundwater monitoring requirement <strong>for</strong><br />
surface impoundments: AZ, LA, MO, ND, NM, NV, NY, OK, SC, TN, UT. Seven states require post-closure groundwater monitoring<br />
only at newly constructed surface impoundments: CO, KY, MI, NC, PA, WI, WV.<br />
Of the 34 states reviewed, 22 states require immediate compliance with post-closure groundwater monitoring requirements <strong>for</strong> landfills:<br />
AL, CO, GA, IA, KS, KY, MD, MI, MN, MO, MT, ND, NY, OH, PA, SC, TN, TX, UT, VA, WA, WY. Eight states require post-closure<br />
groundwater monitoring at newly constructed landfills: FL, IL, LA, MS, NV, OK, WI, WV.<br />
10. Baseline storage tank/container design and operating standards<br />
<strong>The</strong> baseline storage tank /container design and operating standards were not evaluated in this RIA because of a lack of data about the baseline<br />
count and conditions of CCR storage or treatment tanks, containers, and containment buildings at electric utility plants<br />
Industry Baseline CCR Disposal Characterization Findings<br />
Appendix F of this RIA presents on a plant-by-plant basis the baseline engineering controls assumed <strong>for</strong> each of the 383 of the 495 electric<br />
utility plants which onsite dispose CCR (84 plants solely dispose CCR offsite; this RIA assumes that all offsite CCR disposal units are landfills,<br />
and further assumes that all of those offsite landfills currently comply with the engineering controls described in this RIA <strong>for</strong> the regulatory<br />
options). Exhibits 3I (<strong>for</strong> landfills) and Exhibit 3J (<strong>for</strong> impoundments) below summarize the assignment of baseline conditions in this RIA<br />
<strong>for</strong> these 411 plants which dispose CCR onsite.<br />
48