23.10.2014 Views

Analysis - The Institute for Southern Studies

Analysis - The Institute for Southern Studies

Analysis - The Institute for Southern Studies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit 4D<br />

Comparison of Annual O&M Costs <strong>for</strong> Wet and Dry CCR Disposal (Source: 1985 EPA Study; $/dry metric ton)<br />

Plant Size Categories (MW = megawatts)<br />

Row Summary<br />

Wet or Dry 250 500 1000 2000<br />

Across Four Size Categories<br />

Item Disposal Operation CCR Min Max Min Max Min Max Min Max Min Max Midpnt Mean<br />

Fly Ash:<br />

1A Fly ash handling/processing Wet $2.5 $6.8 $1.0 $5.4 $1.6 $4.3 $1.3 $3.6 $1.0 $6.8 $3.9 $3.3<br />

1B Dry $2.5 $4.7 $2.1 $3.9 $1.7 $3.2 $1.5 $2.7 $1.5 $4.7 $3.1 $2.8<br />

2 Fly ash storage Dry $3.3 $6.1 $3.0 $5.6 $2.8 $5.2 $2.5 $4.7 $2.5 $6.1 $4.3 $4.2<br />

3A Fly ash transport Wet $4.2 $7.6 $3.2 $5.9 $2.5 $4.7 $2.0 $3.7 $2.0 $7.6 $4.8 $4.2<br />

3B Dry $1.7 $3.1 $1.5 $2.8 $1.3 $2.5 $1.2 $2.2 $1.2 $3.1 $2.2 $2.0<br />

4A Fly ash placement/disposal Wet $11.5 $21.3 $9.1 $16.8 $7.2 $13.5 $5.7 $10.5 $5.7 $21.3 $13.5 $12.0<br />

4B Dry $7.0 $13.0 $5.6 $10.5 $4.6 $8.5 $3.7 $6.9 $3.7 $13.0 $8.4 $7.5<br />

Subtotal fly ash Wet (1982$) $18.2 $35.7 $13.3 $28.1 $11.3 $22.5 $9.0 $17.8 $8.7 $35.7 $22.2 $19.5<br />

Dry (1982$) $11.2 $20.8 $9.2 $17.2 $7.6 $14.2 $6.4 $11.8 $6.4 $20.8 $13.6 $12.3<br />

Bottom Ash:<br />

5 Bottom ash<br />

Wet/Dry $11.3 $22.8 $9.0 $19.1 $6.9 $15.7 $5.3 $12.8 $5.3 $22.8 $14.1 $12.9<br />

handling/processing<br />

6A Bottom ash transport Wet $9.2 $17.1 $7.3 $13.5 $5.6 $10.3 $4.3 $7.9 $4.3 $17.1 $10.7 $9.4<br />

6B Dry $3.4 $6.3 $2.8 $5.2 $2.2 $4.1 $1.8 $3.3 $1.8 $6.3 $4.1 $3.6<br />

7A Bottom ash<br />

Wet $9.2 $17.1 $7.9 $14.6 $6.5 $12.1 $5.4 $10.0 $5.4 $17.1 $11.3 $10.4<br />

placement/disposal<br />

7B Dry $5.4 $10.0 $4.7 $8.8 $4.1 $7.6 $3.5 $6.5 $3.5 $10.0 $6.8 $6.3<br />

Subtotal bottom ash Wet (1982$) $29.7 $57.0 $24.2 $47.2 $19.0 $38.1 $15.0 $30.7 $15.0 $57.0 $36.0 $32.6<br />

Dry (1982$) $20.1 $39.1 $16.5 $33.1 $13.2 $27.4 $10.6 $22.6 $10.6 $39.1 $24.9 $22.8<br />

Summary (Fly Ash & Bottom Ash):<br />

Weighted average* Wet (1982$) $20.7 $40.4 $15.7 $32.3 $13.0 $25.9 $10.3 $20.6 $10.1 $40.4 $25.2 $22.4<br />

Dry (1982$) $13.2 $24.8 $10.8 $20.7 $8.8 $17.1 $7.3 $14.2 $7.3 $24.8 $16.1 $14.6<br />

2009 updated weighted average** Wet (2009$) $46.4 $90.4 $35.2 $72.3 $29.1 $58.1 $23.1 $46.2 $22.6 $90.4 $56.5 $50.1<br />

Dry (2009$) $29.5 $55.6 $24.2 $46.4 $19.8 $38.3 $16.4 $31.8 $16.4 $55.6 $36.0 $32.7<br />

Incremental cost from conversion to dry disposal = -$17.4<br />

Notes:<br />

* Fly:to:ash weighted average based on 2005 relative annual tonnages evaluated in the RIA: Fly ash tons/year = 15,200,000; Bottom ash tons/year = 4,300,000<br />

** 2009 price update multiplier (source: ENR Construction Cost Index ratio 2009:to:1982 = 8564/3825) = 2.239<br />

89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!