25.10.2014 Views

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

n<br />

a<br />

102<br />

J<br />

K 3 IO’<br />

cn<br />

VI<br />

W<br />

K<br />

n<br />

VI<br />

VI<br />

w<br />

a<br />

2<br />

0<br />

cn<br />

5 100<br />

I<br />

n<br />

MATCH PARAMETERS<br />

AP<br />

= 1.0 psi<br />

t<br />

= 1.0 hr<br />

PO = 0.33<br />

t,/C, = 45<br />

COe2S = 1.0 x 108<br />

PI<br />

= 83.31 psig<br />

0 PRESSURE DATA<br />

* * h<br />

8 PRESSURE-DERIVATIVE DATA<br />

f<br />

- SIMULATIONS<br />

*<br />

I 1 I<br />

lo-’<br />

I<br />

lo-’ 100 10’ 102 103<br />

104<br />

DIMENSIONLESS TIME GROUP. tD/CD<br />

Figure 5-80. Engle/Culebra Pumping Test Drawdown Log-Log Plot with INTERPRET Simulation<br />

MATCH PARAMETERS<br />

AP = 1.0 psi<br />

t<br />

= 1.0 hr<br />

PD = 0.33<br />

fdcD =45<br />

CDe2’ = 1.0 x 108<br />

P’ = 83.31 psig<br />

,/<br />

+ DATA<br />

- SIMULATION<br />

1 I 1<br />

-1 0 1 2 3 4<br />

DIMENSIONLESS SUPERPOSITION FUNCTION: FLOW PERIOD 1<br />

I<br />

Figure 5-81. EngleKulebra Pumping Test Drawdown Dimensionless Horner Plot with INTERPRET Simulation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!