25.10.2014 Views

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

200 ,ll,~,,,~,,,illll,lll,lllll,l 1 1 , 1 1 1 , 1 ,<br />

-<br />

c<br />

-<br />

PRESSURE ABOVE TEST INTERVAL<br />

-<br />

-- / -<br />

PEAK AT 144 8 PSlA<br />

PEAK AT 142 3 PSlA<br />

- -<br />

150 - ,SWAtBED f<br />

-<br />

EQUILIBRATION<br />

- PEAK AT -<br />

143 7 PSlA<br />

5<br />

- -<br />

v)<br />

a - SBU -<br />

E 100-<br />

E<br />

In u)<br />

E<br />

a<br />

\SLUG<br />

- -<br />

-<br />

- -<br />

-<br />

50 - TSFL -<br />

- -<br />

- -<br />

- -<br />

- -<br />

Start Date: 10/08/87<br />

Start Time: 12:OO:OO<br />

10 20 30 40 50 60 70 80 90 100<br />

Elapsed Time in Hours<br />

Linear-Linear Sequence Plot<br />

H-l7/DST 706-731/CULEBRA DOLOMITE<br />

Figure 5-47. H-l7/Culebra Drillstem and Slug Testing Linear-Linear Sequence Plot<br />

-<br />

10'<br />

n<br />

w'<br />

a 1oc<br />

2<br />

/---<br />

v)<br />

w<br />

a<br />

Y**W** 3tw-3t<br />

n<br />

v)<br />

"*?,<br />

v)<br />

w<br />

%I<br />

4<br />

*<br />

E!<br />

MATCH PARAMETERS<br />

2 lo-*<br />

AP = 1.0 psi I<br />

z<br />

t<br />

= 1.0 hr<br />

n<br />

PD = 0.062<br />

tdCD =550<br />

PRESSURE DATA<br />

C,e" =1<br />

-% PRESSURE-DERIVATIVE DATA<br />

PI = 98.0 pria - SIMULATIONS<br />

lo-' 100 10' 102 103<br />

DIMENSIONLESS TIME GROUP, t,/Co<br />

104<br />

Figure 5-48. H-I i'/Culebra First Buildup Log-Log Plot with INTERPRET Simulation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!