25.10.2014 Views

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

102<br />

n" 10'<br />

w'<br />

a<br />

3<br />

v)<br />

v)<br />

W<br />

a<br />

P<br />

2 100<br />

W<br />

A<br />

2<br />

0<br />

v)<br />

Z<br />

z<br />

5 10-1<br />

MATCH PARAMETERS<br />

AP<br />

= 1.0 psi<br />

t<br />

1.0 hr<br />

PO = 0.1<br />

t D/C D = 31<br />

f.Cne2Sl, = 0.4<br />

(Cne2S),., = 4.0 x<br />

Ae-Zs = 0.9<br />

= 29.55 psig<br />

PI<br />

NO-FLOW BOUNDARY<br />

AT D, = 5000<br />

0 PRESSURE DATA<br />

- SIMULATIONS<br />

%- PRESSURE-DERIVATIVE DATA<br />

10-2<br />

10-2 lo-' 100 10' 102 103 104<br />

DIMENSIONLESS TIME GROUP, tD/CD<br />

Figure 5-22. H-8bICulebra Pumping Test Recovery Linear-Linear Sequence Plot with INTERPRET Simulation<br />

50<br />

I<br />

I<br />

+PUMP<br />

ON<br />

45<br />

ul<br />

*- 40<br />

8.<br />

w'<br />

a<br />

3<br />

v)<br />

v)<br />

E 35<br />

30<br />

MATCH PARAMETERS<br />

AP<br />

= 1.0 psi<br />

t<br />

= 1.0 hr<br />

PD = 0.1<br />

tD'CD 31<br />

(CDeZs), = 0.4<br />

(CDeZr),-, = 4.0 x 10-3<br />

Ae-Zs = 0.9<br />

P'<br />

= 40.1 psig<br />

NO-FLOW BOUNDARY<br />

AT Dn = 5000<br />

- SIMULATION<br />

lo = 12/6/85 1O:OO 1 I<br />

25<br />

0 100 200 300<br />

ELAPSED TIME, hours<br />

Figure 5-23. H-8b/Culebra Pumping Test Linear-Linear Sequence Plot with INTERPRET Simulation<br />

65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!