Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...
Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...
Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
102<br />
n" 10'<br />
w'<br />
a<br />
3<br />
v)<br />
v)<br />
W<br />
a<br />
P<br />
2 100<br />
W<br />
A<br />
2<br />
0<br />
v)<br />
Z<br />
z<br />
5 10-1<br />
MATCH PARAMETERS<br />
AP<br />
= 1.0 psi<br />
t<br />
1.0 hr<br />
PO = 0.1<br />
t D/C D = 31<br />
f.Cne2Sl, = 0.4<br />
(Cne2S),., = 4.0 x<br />
Ae-Zs = 0.9<br />
= 29.55 psig<br />
PI<br />
NO-FLOW BOUNDARY<br />
AT D, = 5000<br />
0 PRESSURE DATA<br />
- SIMULATIONS<br />
%- PRESSURE-DERIVATIVE DATA<br />
10-2<br />
10-2 lo-' 100 10' 102 103 104<br />
DIMENSIONLESS TIME GROUP, tD/CD<br />
Figure 5-22. H-8bICulebra Pumping Test Recovery Linear-Linear Sequence Plot with INTERPRET Simulation<br />
50<br />
I<br />
I<br />
+PUMP<br />
ON<br />
45<br />
ul<br />
*- 40<br />
8.<br />
w'<br />
a<br />
3<br />
v)<br />
v)<br />
E 35<br />
30<br />
MATCH PARAMETERS<br />
AP<br />
= 1.0 psi<br />
t<br />
= 1.0 hr<br />
PD = 0.1<br />
tD'CD 31<br />
(CDeZs), = 0.4<br />
(CDeZr),-, = 4.0 x 10-3<br />
Ae-Zs = 0.9<br />
P'<br />
= 40.1 psig<br />
NO-FLOW BOUNDARY<br />
AT Dn = 5000<br />
- SIMULATION<br />
lo = 12/6/85 1O:OO 1 I<br />
25<br />
0 100 200 300<br />
ELAPSED TIME, hours<br />
Figure 5-23. H-8b/Culebra Pumping Test Linear-Linear Sequence Plot with INTERPRET Simulation<br />
65