25.10.2014 Views

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

Beauheim 1987 - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8.0<br />

1 I I I<br />

MATCH PARAMETERS<br />

AP<br />

1.0 psi<br />

".U<br />

+ DATA<br />

- SIMULATION<br />

-2.0 I I 1 1<br />

0.0 0.5<br />

1 .o 1.5 2.0 2.5<br />

DIMENSIONLESS SUPERPOSITION FUNCTION: FLOW PERIOD 3<br />

Figure 5-37. H-l5/Culebra First Buildup Dimensionless Horner Plot with INTERPRET Simulation<br />

10'<br />

0<br />

n<br />

w'<br />

a<br />

3<br />

v)<br />

v)<br />

W<br />

a<br />

n<br />

g 100<br />

W<br />

A<br />

z<br />

0<br />

v)<br />

z<br />

W<br />

r<br />

P<br />

AP<br />

= 1.0 psi<br />

t<br />

= 1.0hr U PRESSURE DATA<br />

PO 0.09<br />

* PRESSURE-DERIVATIVE DATA<br />

tDICo 730<br />

- SIMULATIONS<br />

CoeZs = 3000<br />

Pi<br />

= 69.0 psia<br />

lo-' I I I<br />

100<br />

10' 102 103 104<br />

DIMENSIONLESS TIME GROUP, t,/C,<br />

Figure 5-38. H-1 Wulebra Second Buildup Log-Log Horner Plot with INTERPRET Simulation<br />

76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!