Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Florida</strong> <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong><br />
The <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong> was developed by the FDOT in the following manner:<br />
• Existing seaport and FDOT planning documents were compiled and<br />
reviewed.<br />
• FDOT established a formal <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong> Working Group,<br />
maximizing partner input. The group included a diverse mix of<br />
stakeholders, including: <strong>Florida</strong>’s seaports, FDOT, DCA, OTTED,<br />
Department of Environmental Protection (DEP), U.S. Army Corps of<br />
Engineers, Enterprise <strong>Florida</strong>, Metropolitan <strong>Plan</strong>ning Organization<br />
Advisory Council (MPOAC), railroads, shippers, elected officials, and<br />
more.<br />
• The group specifically was charged with developing policy<br />
recommendations for consideration and use by FDOT during preparation of<br />
the <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong>. The Working Group met five times in open<br />
public meetings to develop policy recommendations to guide the <strong>Plan</strong>, to<br />
develop recommendations for the 2010 SIS Strategic <strong>Plan</strong>, and to review<br />
and discuss technical material to be used as input to the <strong>Plan</strong>.<br />
• Analyses and updates from the recent 2010 Strategic <strong>Plan</strong> Update, the<br />
ongoing <strong>Florida</strong> Transportation <strong>Plan</strong> update, and the <strong>Florida</strong> Trade and<br />
Logistics Study were incorporated as appropriate.<br />
• A 30-day public review process was used to gather stakeholder input on the<br />
draft <strong>Plan</strong>. Comments were reviewed and incorporated in the <strong>Plan</strong> as<br />
appropriate.<br />
<strong>Florida</strong> Department of Transportation 1-9<br />
December 2010