26.11.2014 Views

Florida Seaport System Plan - SeaCIP

Florida Seaport System Plan - SeaCIP

Florida Seaport System Plan - SeaCIP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Florida</strong> <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong><br />

The <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong> was developed by the FDOT in the following manner:<br />

• Existing seaport and FDOT planning documents were compiled and<br />

reviewed.<br />

• FDOT established a formal <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong> Working Group,<br />

maximizing partner input. The group included a diverse mix of<br />

stakeholders, including: <strong>Florida</strong>’s seaports, FDOT, DCA, OTTED,<br />

Department of Environmental Protection (DEP), U.S. Army Corps of<br />

Engineers, Enterprise <strong>Florida</strong>, Metropolitan <strong>Plan</strong>ning Organization<br />

Advisory Council (MPOAC), railroads, shippers, elected officials, and<br />

more.<br />

• The group specifically was charged with developing policy<br />

recommendations for consideration and use by FDOT during preparation of<br />

the <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong>. The Working Group met five times in open<br />

public meetings to develop policy recommendations to guide the <strong>Plan</strong>, to<br />

develop recommendations for the 2010 SIS Strategic <strong>Plan</strong>, and to review<br />

and discuss technical material to be used as input to the <strong>Plan</strong>.<br />

• Analyses and updates from the recent 2010 Strategic <strong>Plan</strong> Update, the<br />

ongoing <strong>Florida</strong> Transportation <strong>Plan</strong> update, and the <strong>Florida</strong> Trade and<br />

Logistics Study were incorporated as appropriate.<br />

• A 30-day public review process was used to gather stakeholder input on the<br />

draft <strong>Plan</strong>. Comments were reviewed and incorporated in the <strong>Plan</strong> as<br />

appropriate.<br />

<strong>Florida</strong> Department of Transportation 1-9<br />

December 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!