Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Florida</strong> <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong><br />
Table 5.2<br />
Port Everglades 5-Year, 10-Year, 20-Year, and Long-<br />
Term Needs Beyond 20 Years 4 (continued)<br />
Project Name<br />
Estimated Cost<br />
20-Year Vision <strong>Plan</strong>: Years 2020-2029<br />
Northport Slip 2 New Bulkheads and Widening $71,000,000<br />
Slip 1 New Bulkheads and Reconfiguration- $48,000,000<br />
Phase 2<br />
Slip 3 New Bulkheads and Widening $85,000,000<br />
Midport Berth 19, 20 Bulkheads $25,000,000<br />
Berth 21, 22 Bulkheads $29,000,000<br />
Berth 23 Bulkhead $8,000,000<br />
Berth 24, 25 Bulkheads $27,000,000<br />
Multimodal Facility- Phase 2 $100,000,000<br />
Container Yard Improvements $30,000,000<br />
Southport Super Post Panamax Cranes (2) $24,000,000<br />
Demolish RORO Berths and Lengthen Berth 33 $22,000,000<br />
Total $461,000,000<br />
Outside 20-Year Timeframe<br />
Automated People Mover/Intermodal Center (APM/IMC) $1,377,000,000<br />
Total $1,377,000,000<br />
Source: Port Everglades, October 2010.<br />
4<br />
This table represents proposed projects that will be part of the 2009 Port Everglades<br />
Master/Vision <strong>Plan</strong> Update which is ongoing at this time.<br />
<strong>Florida</strong> Department of Transportation 5-7<br />
December 2010