26.11.2014 Views

Florida Seaport System Plan - SeaCIP

Florida Seaport System Plan - SeaCIP

Florida Seaport System Plan - SeaCIP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Florida</strong> <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong><br />

Table 5.2<br />

Port Everglades 5-Year, 10-Year, 20-Year, and Long-<br />

Term Needs Beyond 20 Years 4 (continued)<br />

Project Name<br />

Estimated Cost<br />

20-Year Vision <strong>Plan</strong>: Years 2020-2029<br />

Northport Slip 2 New Bulkheads and Widening $71,000,000<br />

Slip 1 New Bulkheads and Reconfiguration- $48,000,000<br />

Phase 2<br />

Slip 3 New Bulkheads and Widening $85,000,000<br />

Midport Berth 19, 20 Bulkheads $25,000,000<br />

Berth 21, 22 Bulkheads $29,000,000<br />

Berth 23 Bulkhead $8,000,000<br />

Berth 24, 25 Bulkheads $27,000,000<br />

Multimodal Facility- Phase 2 $100,000,000<br />

Container Yard Improvements $30,000,000<br />

Southport Super Post Panamax Cranes (2) $24,000,000<br />

Demolish RORO Berths and Lengthen Berth 33 $22,000,000<br />

Total $461,000,000<br />

Outside 20-Year Timeframe<br />

Automated People Mover/Intermodal Center (APM/IMC) $1,377,000,000<br />

Total $1,377,000,000<br />

Source: Port Everglades, October 2010.<br />

4<br />

This table represents proposed projects that will be part of the 2009 Port Everglades<br />

Master/Vision <strong>Plan</strong> Update which is ongoing at this time.<br />

<strong>Florida</strong> Department of Transportation 5-7<br />

December 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!