Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Florida Seaport System Plan - SeaCIP
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Florida</strong> <strong>Seaport</strong> <strong>System</strong> <strong>Plan</strong><br />
Table 5.2<br />
Port Everglades 5-Year, 10-Year, 20-Year, and<br />
Long-Term Needs Beyond 20 Years 3<br />
Project Name<br />
Estimated Cost<br />
5-Year Vision <strong>Plan</strong>: Years 2011-2015<br />
Northport Slip 1 New Bulkheads and Reconfiguration- Phase 1 $55,000,000<br />
By-Pass Road- Phase 1 $2,000,000<br />
By-Pass Road- Phase 2 $32,000,000<br />
Cruise Terminal #2 Improvements $4,200,000<br />
Cruise Terminal #4 Improvements $13,000,000<br />
New Petroleum Tank Farm $75,000,000<br />
Slip 2 Westward Lengthening $23,000,000<br />
Midport Cruise Terminal #19 Improvements $11,430,000<br />
Cruise Terminal #19 Improvements $5,050,000<br />
Cruise Terminal #19 Improvements $13,320,000<br />
CT #18 Parking Garage $32,000,000<br />
Tracor Basin Finger Pier Replace with Catwalk + Dolphin $5,200,000<br />
Southport McIntosh Road Improvements $11,200,000<br />
Upland Enhancement $11,000,000<br />
Westlake Mitigation $12,600,000<br />
Super Post Panamax Crane (1) $12,000,000<br />
Turning Notch Expansion- Contract 1 $67,080,000<br />
ICTF – Rail and Yard $42,000,000<br />
Portwide ACOE Deepening and Widening- Design $4,000,000<br />
Total $431,080,000<br />
10-Year Vision <strong>Plan</strong>: Years 2016-2019<br />
Northport Berth 1, 2, 3 bulkheads $31,000,000<br />
CT#4 Parking Garage $32,000,000<br />
Midport Berth 16, 17, 18 bulkheads $32,000,000<br />
Multimodal Facility- Phase 1 $35,000,000<br />
Southport Turning Notch Expansion- Contract 2 $28,810,000<br />
Crushed Rock Facility $55,000,000<br />
FTZ and CBP Relocation $44,410,000<br />
Super Post Panamax Cranes (2) $24,000,000<br />
Container Yard Improvements $30,000,000<br />
Portwide ACOE Dredging/Widening $255,000,000<br />
Total $567,220,000<br />
3<br />
This table represents proposed projects that will be part of the 2009 Port Everglades<br />
Master/Vision <strong>Plan</strong> Update which is ongoing at this time.<br />
5-6 <strong>Florida</strong> Department of Transportation<br />
December 2010