Agenda Volume 3 - Methodist Conference
Agenda Volume 3 - Methodist Conference
Agenda Volume 3 - Methodist Conference
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
57. The Fruitful Field Project<br />
causing undue complexity, unclear<br />
understandings of responsibility and<br />
accountability, or unproductive levels<br />
of bureaucracy.<br />
Implementation<br />
255 The Committee recommends a<br />
transitional as well as a long-term<br />
role for the new governance structure.<br />
The governance structure has<br />
the potential to be a mechanism<br />
which can oversee in some detail<br />
much of the wider transitional<br />
work which will be required to<br />
establish the Discipleship and<br />
Ministries Learning Network, to<br />
codify its structures, policies and<br />
procedures, to configure its financial<br />
resources, and to implement with<br />
care the recommendations made<br />
in section J. For this reason, the<br />
Committee recommends that the<br />
<strong>Methodist</strong> Council should oversee<br />
the establishment of the governance<br />
structure during 2012/2013<br />
and make a report to the 2013<br />
<strong>Conference</strong>.<br />
256 The Committee therefore further<br />
recommends that the governance<br />
structure should, at the earliest<br />
opportunity at which the <strong>Methodist</strong><br />
Council judges it to be appropriate,<br />
become the governing body for<br />
the following centres, institutions<br />
and colleges: Cliff College, the Guy<br />
Chester Centre (the North Bank<br />
Estate), the <strong>Methodist</strong> Diaconal Order<br />
Centre, MIC and the Southlands<br />
<strong>Methodist</strong> Trust. The Committee also<br />
recommends that the governance<br />
structure should, if the <strong>Methodist</strong><br />
Council judges it to be necessary or<br />
desirable, adopt the Council’s existing<br />
responsibilities for the following<br />
institutions, colleges and centres:<br />
Hartley Victoria College, the York<br />
Institute for Community Theology<br />
and the Wesley Study Centre. The<br />
Committee also recommends that<br />
the governance structure should, at<br />
the earliest opportunity, consult with<br />
the trustees of Wesley House about<br />
the future of the Trust, assisting the<br />
trustees with their responsibilities<br />
during a period of transition as<br />
necessary or appropriate.<br />
257 The Committee also recommends<br />
that, following further detailed<br />
negotiations with the governors<br />
of the Queen’s Foundation and<br />
relevant parties within the Church<br />
of England, an appropriate scheme<br />
for the governance structure to<br />
share robustly and consistently in<br />
the holistic oversight of the Queen’s<br />
Foundation should be prepared and<br />
implemented.<br />
258 The Committee will, at the earliest<br />
opportunity, consult with the chairs<br />
of the <strong>Methodist</strong> Training Forums of<br />
the Regional Training Networks (see<br />
paragraph 68 above) and will seek to<br />
present a joint paper from the chairs<br />
and the Committee for consideration<br />
by the <strong>Methodist</strong> Council’s “larger<br />
than Circuit” working party about the<br />
Forums’ role as spaces for regional<br />
conferring.<br />
752 <strong>Conference</strong> <strong>Agenda</strong> 2012