Agenda Volume 3 - Methodist Conference
Agenda Volume 3 - Methodist Conference
Agenda Volume 3 - Methodist Conference
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
57. The Fruitful Field Project<br />
connexional assets, the Committee<br />
recognises its complementary duty<br />
to adopt a realistic attitude towards<br />
the income which the Network can<br />
expect to receive through the District<br />
Assessment and from connexional<br />
funds. Consequently, in order to<br />
achieve a sustainable income stream<br />
which can support the entirety of the<br />
Network’s purposes and activities, the<br />
Committee is confident of the need<br />
for the fund and asset management<br />
strategy outlined above.<br />
270 Acting on the advice of the<br />
Connexional Treasurers, the<br />
Committee also recommends that<br />
this strategy include consideration of<br />
fundraising and the encouragement<br />
of generous giving to support the<br />
Network’s activities. The funds<br />
contributed by Circuits and Districts<br />
during 2001/2007 to establish<br />
the Training Assessment Fund<br />
may demonstrate a readiness to<br />
support focused and intentional<br />
fundraising campaigns in this area<br />
of the Connexion’s life. Grass roots<br />
involvement and engagement is<br />
essential to the success of the<br />
Discipleship and Ministries Learning<br />
Network in many ways. Moreover,<br />
interest has already been shown<br />
by a number of Partner Churches<br />
in collaborating with the life of<br />
the Network, and this may also<br />
open avenues to other fundraising<br />
opportunities. Any such fundraising<br />
initiatives will clearly need to<br />
exist within the wider connexional<br />
fundraising strategy.<br />
Capital expenditure<br />
271 Planned preventative maintenance<br />
costs at Cliff College and the<br />
Queen’s Foundation will form part of<br />
a developing premises-management<br />
strategy for both centres. It is<br />
anticipated that these costs will<br />
be met from revenue expenditure,<br />
including from the budgeted allocation<br />
within the Network’s expenditure for<br />
maintenance and premises-related<br />
purposes. However, within both<br />
centres, development work will be<br />
required both to generate increased<br />
capacity and to enhance the quality<br />
of the learning environment. These<br />
moderate capital projects will be in<br />
addition to those capital projects<br />
which both centres have already<br />
been developing and whose costs<br />
the centres anticipate being able to<br />
meet from funds already earmarked<br />
for the purpose. The Committee<br />
recommends that the costs of<br />
moderate capital expenditure projects<br />
at the two centres should be met<br />
from the Network’s funds. Prudent<br />
management of the funds and assets<br />
of the Network will largely determine<br />
the magnitude of the additional<br />
capital expenditure projects which the<br />
Network will be able to support.<br />
Other centre activities<br />
272 The two centres at Cliff College<br />
and the Queen’s Foundation will,<br />
as is currently the case, continue<br />
to serve significant constituencies<br />
outside and beyond the life of the<br />
<strong>Methodist</strong> Church, and to meet goals<br />
<strong>Conference</strong> <strong>Agenda</strong> 2012 757