168 REPORT OF THE BUREAU OF MINES. Off. Doc.<br />

into the gun boat—hoisted to the top of the slope and dumped<br />

into a chute provided for that purpose—carried along a traveling platform<br />

where the process of separating the slate from the coal will<br />

be carried out, after which it will be reloaded and sent to the breaker,<br />

the slate going to the culm bank.<br />

A pair of hoisting engines 18x36 inches, geared 5 to 1, will be<br />

installed as soon as conditions warrant the same. The work of<br />

grading that part of the slope driven through the rock to the<br />

surface is progressing as rapidly as the conditions and weather<br />

will permit, after which three rows of props will be placed in line<br />

throughout the entire length of the slope and the tracks laid, when<br />

it will be ready for operation, which will, in due time, handle the<br />

entire output of the colliery with the exception of the Mammoth vein<br />

s trippings. A tunnel has been driven south 320 feet long from the<br />

west gangway, slope No. 2, Mammoth vein, cutting the Gamma vein<br />

directly in line with the slope and will be driven north from west No.<br />

2 Mammoth gangway to the south dip Gamma vein, connecting the<br />

north and south sides of the basin with the new slope.<br />

Lattimer Breaker.—Has been enlarged by extensive additions and<br />

has been entirely remodeled, new and improved machinery installed<br />

and shaking screens substituted for the former revolving screens,<br />

additional jigs were put in and the plant in general has been modernized.<br />

An electric light plant has been installed, which lights the<br />

breaker and its surroundings with incandescent and arc lights.<br />

The building is heated by steam.<br />

A new frame building, 30x65 feet, has been erected as a machine<br />

shop and equipped throughout with the most modern appliances.<br />

Also, a frame building, 32x65 feet, has been erected as a blacksmith<br />

shop. In addition to the necessary requirements for three fires, it<br />

has been equipped with a No. 2 Hilles & Jones double punch shears.<br />

An 800-pound steam hammer is on hand ready to be set in place.<br />

frame building, 30x65 feet, two stories high, has been built as a carpenter<br />

shop. A fan house and a 16-foot fan has been erected over the<br />

top of Slope B, to ventilate the No. 2 Gamma workings, the slope<br />

being used as an upcast.<br />

Harwood Colliery.—In the West Buck Mountain gangway, Slope<br />

No. 2, a slope has been driven 1,150 feet to the surface across the<br />

pitch, at a vertical angle ranging from 5 degrees to 13 degrees, coming<br />

to the surface at a point convenient to the conveyor pit from which<br />

the coal is carried up into the breaker. The original proposition<br />

being to continue the slope downward in the Buck Mountain vein to<br />

a point near the eastern boundary line, terminating in the center<br />

of the basin, and to eventually concentrate the entire output of<br />

slopes Nos. 5, 4 and 2 to this slope, which means the abandonment of<br />

those plants. In prosecuting the work in.West No. 2 Buck Mountain<br />