Whiting (2006) Not all of the alarms and interlocks that serve a safety function were included in the mechanical integrity maintenance program. Numerous past due inspections and extended inspection due dates existed, and the management system to evaluate and controlvariances to test and inspection intervals was ad hoc or not well defined. Rupture disks positioned below relief valves may have failed in a manner that would have rendered the associated relief valvesineffective.Finding:BP’s safety management system does not ensure timely compliance with internal process safety standardsand programs at BP’s five U.S. refineries.Process Safety Management Systems C 144