11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Multimodal</strong> PackagesTable 3.20 Map Key for Bicycle and Pedestrian System Enhancements (continued)Map ID Project Name Description18 South Washington Boulevard Trail Construct sidepath on west side <strong>of</strong> S. Washington Boulevardfrom Arlington Boulevard to Columbia Pike19 Metrorail Station Bicycle ParkingEnhancement – Court House*20 Mount Vernon Trail Extension fromNorth Randolph Street to the ArlingtonCounty LineEnhance bicycle parking at the Court House Metrorail StationConstruct a short segment <strong>of</strong> trail between North RandolphStreet and the Fairfax line, following an existing sanitary sewereasement near Pimmit Run. Extend the Mount Vernon Trailfrom its current terminus at Theodore Roosevelt Island usingexisting trails, bicycle lanes, and proposed bicycle lanes inArlington.21 Lyon Village-Custis Trail Upgrade Upgrade switchback behind Lyon Village shopping center toimprove bicyclist safety22 Metrorail Station Bicycle ParkingEnhancement – Clarendon*Enhance bicycle parking at the Clarendon Metrorail Station23 Clarendon Connector Create an on- and <strong>of</strong>f-street connector <strong>of</strong> the Fairfax Drivebicycle lanes to the Wilson and Clarendon Boulevard bicyclelanes via Clarendon Circle24 Arlington Boulevard and Irving StreetIntersection25 Metrorail Station Bicycle ParkingEnhancement – <strong>Virginia</strong> Square*26 Metrorail Station Bicycle ParkingEnhancement – Ballston*Improve bicycle and pedestrian safety and accommodationEnhance bicycle parking at the <strong>Virginia</strong> Square Metrorail StationEnhance bicycle parking at the Ballston Metrorail Station27 Fairfax Drive Trail Connectors Reconstruct Fairfax Drive west <strong>of</strong> North Glebe Road to improveaccess to the Bluemont Junction and Custis trails, through widersidewalk/trails, and improved ramps and signage.28 Arlington Boulevard/Glebe RoadInterchange29 Arlington Boulevard TrailRehabilitation30 Arlington Boulevard and Park DriveIntersectionIncorporate bicycle and pedestrian improvements in ArlingtonBoulevard/Glebe Road interchange enhancementsRehabilitate Arlington Boulevard Trail from Glebe Road to ParkDriveImprove bicycle and pedestrian safety and accommodation31 Harrison Street Bicycle Boulevard Construct bicycle boulevard from Wilson Boulevard toWilliamsburg Boulevard32 Arlington Boulevard and ManchesterStreet IntersectionImprove bicycle and pedestrian safety and accommodation33 Bluemont Park to Upton Hill Park Trail Construct a 10-foot wide, paved trail adjacent to WilsonBoulevard from the W&OD and Four Mile Run trails inBluemont Park into Upton Hill Regional Park34 Arlington Boulevard Trail Construct a 10-foot wide sidepath from City <strong>of</strong> Fairfax toexisting Arlington Boulevard trail in Arlington (may includesome use <strong>of</strong> existing frontage roads)I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong> 3-77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!