11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Multimodal</strong> PackagesTable 3.21 2040 Benefit Calculations for Bicycle and Pedestrian SystemEnhancements (continued)Map IDProject NameTotal Annual Benefit(Assumes 0.9%Bicycle Mode Share)Total Annual Benefit(Assumes 1.8%Bicycle Mode Share)21 Lyon Village–Custis Trail Upgrade $2,443,982 $4,393,19623 Clarendon Connector $2,803,511 $4,922,57224 Arlington Boulevard and Irving Street Intersection $2,431,339 $4,303,92127 Fairfax Drive Trail Connectors $2,175,586 $3,877,36428 Arlington Boulevard/Glebe Road Interchange $2,476,824 $4,377,75529 Arlington Boulevard Trail Rehabilitation $3,720,998 $6,642,56530 Arlington Boulevard and Park Drive Intersection $2,006,253 $3,552,41131 Harrison Street Bicycle Boulevard $2,607,787 $4,592,09732 Arlington Boulevard and Manchester Street Intersection $1,365,185 $2,420,05633 Bluemont Park to Upton Hill Park Trail $1,849,424 $3,324,64034 Arlington Boulevard Trail $5,325,713 $9,477,84235 Four Mile Run Trail Widening (North) $1,424,057 $2,546,38436 W&OD Realignment at East Falls Church Park $1,160,550 $2,047,50037 Roosevelt Boulevard Sharrows $1,258,875 $2,218,07838 Hillwood Avenue/Lee Hwy Bicycle Lanes $1,842,715 $3,259,37839 W&OD Realignment at East Falls Church $1,185,582 $2,123,03840 East Falls Church Metrorail Station Bikeshare $80,249 $80,24941 Metrorail Station Bicycle Parking Enhancement –East Falls Church$102,135 $991,22942 W&OD Trail Crossing at Lee Highway $1,054,877 $1,860,15443 S. Washington Street On-Road Bicycle Facility $1,886,190 $3,334,71844 Falls Church Area Bikeshare Stations $401,243 $401,24345 W&OD Realignment at West Street $1,062,658 $1,872,28346 Westmoreland Street On-Road Bicycle Facility $1,656,509 $2,917,19747 Great Falls Street Bicycle Lanes $2,071,255 $3,<strong>66</strong>5,85248 West Street Bicycle Lanes $1,154,534 $2,030,63149 N Oak Street On-Road Bicycle Facility $1,540,107 $2,702,67150 West Street On-Road Bicycle Facility $1,571,791 $2,763,65251 West Falls Church Connector $1,281,501 $2,295,53552 VA Route 7 Falls Church to Tysons Connector $2,619,754 $4,635,22853 Fairwood Lane Shared Roadway $1,480,152 $2,616,10554 West Street Shared Roadway $1,426,286 $2,511,15355 George C Marshall Drive/Los Pueblos Lane Bicycle Lanes $1,451,633 $2,571,44856 I-495 Pedestrian/Bicycle Bridge – Connector Trail $1,370,140 $2,447,90757 Hurst Street/<strong>Virginia</strong> Lane $1,185,159 $2,099,65758 Sandburg Street Connection $2,185,114 $3,835,71859 Gallows Road Bicycle Lanes $2,757,570 $4,865,11560 Cottage Street Bicycle Lanes $1,722,2<strong>66</strong> $3,048,8843-86 I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!