11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Multimodal</strong> PackagesTable 3.25 Bicycle Projects Grouped by Trip Orientation ServedMap ID Project Name Trip Orientation12 Meade Street Bridge Both14 Arlington Boulevard Trail (Taft to Ft. Myer) Both15 Arlington Boulevard Trail (10 th to Taft) Both16 Arlington Boulevard Trail (Pershing to Queen) Both17 Arlington Boulevard Trail North Side Trail Extension Both23 Clarendon Connector Both27 Fairfax Drive Trail Connectors Both35 Four Mile Run Trail Widening (North) Both46 Westmoreland Street On-Road Bicycle Facility Both47 Great Falls Street Bicycle Lanes Both49 N Oak Street On-Road Bicycle Facility Both50 West Street On-Road Bicycle Facility Both51 West Falls Church Connector Both52 VA Route 7 Falls Church to Tysons Connector Both59 Gallows Road Bicycle Lanes Both48 West Street Bicyce Lanes Both54 West Street Shared Roadway Both54 Fairwood Lane Shared Roadway Both58 Sandburg Street Connection Both8.1 Capital Bikeshare (East) Both8.2 Capital Bikeshare (West) Both9.1 Commercial Area Bicycle Parking (East) Both9.2 Commercial Area Bicycle Parking (West) Both40 East Falls Church Metrorail Station Bikeshare Both60 Cottage Street Bicycle Lanes Both1 Mount Vernon Trail Widening Linear2 Roosevelt Bridge to Mount Vernon Trail Linear5 Washington Boulevard Trail Linear6 VA Route 27 (Washington Boulevard) Bridge over South VA Route 110 Linear10 Rosslyn Circle Area Improvements – Tunnel Linear11 Rosslyn Circle Area Improvements – Street Level Linear13 Custis (I-<strong>66</strong>) Trail Renovation Linear18 South Washington Boulevard Trail Linear20 Mount Vernon Trail Extension from North Randolph Street to the ArlingtonCounty LineLinear21 Lyon Village–Custis Trail Upgrade Linear24 Arlington Boulevard and Irving Street Intersection Linear28 Arlington Boulevard/Glebe Road Interchange Linear29 Arlington Boulevard Trail Rehabilitation Linear30 Arlington Boulevard and Park Drive Intersection LinearI-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong> 3-95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!