<strong>Multimodal</strong> PackagesCost EstimatesPlanning-level cost estimates in 2011 dollars were developed by calculating rough quantitiesand applying unit costs gathered from multiple sources, including recent VDOT and ArlingtonCounty bid documents. Additional resources include cost information from industry sourcessuch as the 2012 RSMeans, and previous project work performed by the project team for VDOT,Arlington County, and other locales in Northern <strong>Virginia</strong> and Washington, D.C.Cost estimates for all improvements are shown in Table 3.22, and include design and construction,and include all typical items found in the scope <strong>of</strong> work for facility improvements,including earthwork, markings, signs, and items such as maintenance <strong>of</strong> traffic and utilityadjustments. It is recognized that the costs for these elements may vary based on the uniqueaspects <strong>of</strong> each project, and that more accurate cost estimates would be developed in conjunctionwith more detailed planning and design.Table 3.22 2040 Cost Estimates for Bicycle and Pedestrian System EnhancementsMap ID Project Name Estimated Cost1 Mount Vernon Trail Widening $2,931,5002 Roosevelt Bridge to Mount Vernon Trail $400,0003 VA Route 110 South Trail Paving $347,7004 VA Route 110 North Trail Renovation $258,4005 Washington Boulevard Trail $321,3006 VA Route 27 (Washington Boulevard) Bridge over South VA Route 110 $109,0007 Metrorail Station Bicycle Parking Enhancement – Rosslyn $9,8008.1 Capital Bikeshare (East) $513,0008.2 Capital Bikeshare (West) $741,0009.1 Commercial Area Bicycle Parking (East) $4,0009.2 Commercial Area Bicycle Parking (West) $4,50010 Rosslyn Circle Area Improvements – Tunnel $4,200,00011 Rosslyn Circle Area Improvements – Street Level $3,336,20012 Meade Street Bridge $2,880,60013 Custis (I-<strong>66</strong>) Trail Renovation $2,295,00014 Arlington Boulevard Trail (Taft to Ft. Myer) $377,50015 Arlington Boulevard Trail (10 th to Taft) $112,40016 Arlington Boulevard Trail (Pershing to Queen) $426,20017 Arlington Boulevard Trail North Side Trail Extension $428,20018 South Washington Boulevard Trail $464,50019 Metrorail Station Bicycle Parking Enhancement – Court House $127,20020 Mount Vernon Trail Extension from North Randolph Street to the Arlington$68,400County Line21 Lyon Village–Custis Trail Upgrade $8,90022 Metrorail Station Bicycle Parking Enhancement – Clarendon $394,80023 Clarendon Connector $268,30024 Arlington Boulevard and Irving Street Intersection $198,40025 Metrorail Station Bicycle Parking Enhancement – <strong>Virginia</strong> Square $100,4003-88 I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!