11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Mobility OptionsKeeps mobility option elements without fatal implementation constraints. Potential fatalflaws are considered to be those that would severely limit the ability to implement (e.g.,cost prohibitive, right-<strong>of</strong>-way (ROW) prohibitive).Table 2.1 presents the mobility option elements within each mobility solution after the synthesisprocess.Table 2.1 Mobility Solutions and Mobility Option Elements1. I-<strong>66</strong> Capacity Enhancement I-<strong>66</strong> – Widen from I-495 to Arlington County Line I-<strong>66</strong> – Widen from Fairfax County Line to D.C. District Line U.S. 29/Lee Highway Eastbound on-ramp to I-<strong>66</strong>2. Arterial Capacity Enhancement U.S. 50/Arlington Boulevard – Widen from VA 120/Glebe Road to VA 27/Washington Boulevard U.S. 50/Arlington Boulevard – Upgrade to a limited access highway via the construction <strong>of</strong> interchangesand the reconstruction <strong>of</strong> existing interchanges and intersections from the Fairfax CountyLine to the District <strong>of</strong> Columbia VA 27/Washington Boulevard – Widen from U.S. 50/Arlington Boulevard to VA 244/ColumbiaPike U.S. 29/Lee Highway – Widen from VA 309 North/Old Dominion Drive to VA 309 South/OldDominion Drive U.S. 29/Lee Highway – Widen from VA 309 South/Old Dominion Drive to Kenmore Street U.S. 29/Lee Highway – Widen from VA 243/Nutley Street to Western City Line <strong>of</strong> Falls Church City U.S. 29/Lee Highway – Widen from Eastern City Line <strong>of</strong> Falls Church City to Sycamore Street3. I-<strong>66</strong> HOT Lane System I-<strong>66</strong> – Make the existing facility HOT for 24/7 I-<strong>66</strong> – Eliminate exemptions (hybrid and airport traffic) and enhance enforcement4. HOV Restrictions/Exemptions I-<strong>66</strong> – Add bus/van/HOV 3+ lane in each direction with HOV 3+restrictions (both directions, alllanes HOV 3+) I-<strong>66</strong> – Expand HOV hours to be consistent with I-<strong>66</strong> outside the Beltway (5:30-9:30 a.m., 3:00-7:00 p.m.) I-<strong>66</strong> – Eliminate exemptions (hybrid and airport traffic) and enhance enforcement5. ITS/System Operations I-<strong>66</strong> – Active Traffic Management – Provide enhanced mobility and safety (upgraded ramp metersand possible dynamic merge system at VA 267/Dulles Toll Road interchange) U.S. 29/Lee Highway – Safety and signal improvements consistent with the Arlington CountyComprehensive Plan (pedestrian signals, construction <strong>of</strong> new sidewalks, and streetscapeimprovements) from the Fairfax County Line to the Potomac River District-wide Transit ITS in Other Corridors (non-Dulles) – <strong>Study</strong>/Implement ITS improvementsfor district-wide transit ITS in other corridors (non-Dulles)2-4 I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!