11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Multimodal</strong> PackagesTable 3.24Prioritized Bicycle and Pedestrian System Enhancements (continued)Map ID Project Name Combined Score39 W&OD Realignment at East Falls Church 1040 East Falls Church Metrorail Station Bikeshare 1041 Metrorail Station Bicycle Parking Enhancement – East Falls Church 1142 W&OD Trail Crossing at Lee Highway 743 S. Washington Street On-Road Bicycle Facility 1044 Falls Church Area Bikeshare Stations 1145 W&OD Realignment at West Street 946 Westmoreland Street On-Road Bicycle Facility 947 Great Falls Street Bicycle Lanes 1048 West Street Bicycle Lanes 1049 N Oak Street On-Road Bicycle Facility 1050 West Street Bicycle Lanes 1051 West Falls Church Connector 752 VA Route 7 Falls Church to Tysons Connector 1053 Fairwood Lane Shared Roadway 854 West Street Shared Roadway 855 George C. Marshall Drive/Los Pueblos Lane Bicycle Lanes 956 I-495 Pedestrian/Bicycle Bridge – Connector Trail 757 Hurst Street/<strong>Virginia</strong> Lane 658 Sandburg Street Connection 1159 Gallows Road Bicycle Lanes 1360 Cottage Street Bicycle Lanes 12Potential Grouping Based on Trip OrientationOne option is present priority groupings <strong>of</strong> projects to facilitate implementation. One potentialprioritization approach presented groups projects based on the orientation <strong>of</strong> trips potentiallyserved by each improvement. Each project was classified based on its potential to facilitatelonger distance “linear” commute trips, shorter “transit access” trips, or a combination <strong>of</strong> thetwo. Projects may be bundled that relate to the each multimodal package. For instance, transitaccess projects may be emphasized to support enhanced transit elements <strong>of</strong> the multimodalpackage and linear elements may be emphasized to complement improvements to I-<strong>66</strong>. SeeFigure 3.46 and Table 3.25 for a list <strong>of</strong> projects grouped by the types <strong>of</strong> trips they would be mostlikely to support.I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong> 3-93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!