11.07.2015 Views

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

I-66 Multimodal Study Final Report - Virginia Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Multimodal</strong> PackagesTable 3.4 CLRP and CLRP+/Baseline Improvements (continued)Category CLRP CLRP+ aNew Rail Services/Capital Projects (continued)2 Clarendon Metrorail Station Improvements (including canopy project) ■3 Rosslyn Metrorail Station Improvements (including access improvements) ■4 Courthouse Metrorail Station Improvements ■5 Ballston Metrorail Station Improvements – Ballston Station west entrance ■6 East Falls Church Metrorail Station Improvements, including a new station entranceconnecting to VA 237/Washington BoulevardBicycle/PedestrianImprovements and Upgrades1 VA 110/Jefferson Davis Highway South Trail Paving – from VA 110 South/JeffersonDavis Highway to Memorial Drive2 VA 650/Gallows Road – On Road Bicycle Facility ■TDM1 Enhanced Corridor Marketing ■2 Vanpool Driver Incentive ■3 I-<strong>66</strong> Corridor-Specific Startup Carpool Incentives (Expanded) ■4 Rideshare Program Operational Support ■5 Carsharing at Priority Bus Activity Nodes ■6 Bicycle Hubs/Storage at Priority Bus Activity Nodes ■7 TDM Program Evaluation ■8 Enhanced <strong>Virginia</strong> Vanpool Insurance Pool ■9 Enhanced Telework!VA ■10 Northern <strong>Virginia</strong> Ongoing Financial Incentive ■11 Van Priority Access ■12 Capital Assistance for Vanpools ■13 Flexible Vanpool Network ■14 SmartBenefits Subsidy Public Share ■15 Mobility Centers/Mobile Commuter Stores ■16 Real-Time Parking Information (at Metrorail Park-and-Ride facilities) ■ITS (<strong>Multimodal</strong>)Highway1 Interstate ITS and Travel Information ■2 Primary System – Maintenance and Operational Improvements – Provision <strong>of</strong>maintenance and operational improvements along the primary system. Improvementsarising from VDOT’s State Traffic Operations and Safety Improvement Program,wetland mitigation monitoring, and the implementation/installation <strong>of</strong> a central,computerized traffic signal control system.Transit1 District-wide Transit ITS in Other Corridors (non-Dulles) – <strong>Study</strong>/Implement ITSimprovements for District-wide Transit ITS in Other Corridors (non-Dulles)■■■■aThe I-<strong>66</strong> Transit/TDM <strong>Study</strong> is the only source for mobility option elements classified as CLRP+.I-<strong>66</strong> <strong>Multimodal</strong> <strong>Study</strong> 3-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!