12.07.2015 Views

ocp192_en

ocp192_en

ocp192_en

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

European CommissionThe Second Economic Adjustm<strong>en</strong>t Programme for Greece. Fourth ReviewΡar /ΡageMoU2.7.2.1.iMEFP(37)MoU2.7.2.1.iiMEFP(37)MoU2.7.2.2MoU2.7.3.1MoU2.7.3.2MoU2.7.3.3MoU2.7.3.3Action Deadline Comm<strong>en</strong>ts StatusThe Authorities will pres<strong>en</strong>t draft legislation to bring theanti-corruption legal framework in line with relevantinternational standards, including the UN anti-corruptionconv<strong>en</strong>tion, and the OECD and Council of Europe anticorruptionconv<strong>en</strong>tions and recomm<strong>en</strong>dations;The Authorities will initiate the implem<strong>en</strong>tation of all theoutstanding actions in the action plan, initially scheduledfor the period March-July 2013.The Authorities will <strong>en</strong>sure that the National coordinatorfor anti-corruption is fully operational. This will requirethe availability of premises and all the necessaryinfrastructure, the start of operation of the NationalCoordinator governance structure, and the developm<strong>en</strong>t ofinternal and external coordination mechanisms.The Authorities take action to consolidate the curr<strong>en</strong>tpreparatory work into a compreh<strong>en</strong>sive and <strong>en</strong>dorsednational e-Governm<strong>en</strong>t strategy, setting the vision,objectives, priorities, monitoring and coordinationmechanisms for supporting the developm<strong>en</strong>t, promotionand application of e-Governm<strong>en</strong>t and e-services for abetter internal functioning of the administration and tocitiz<strong>en</strong>s. The strategy, which will <strong>en</strong>compass animplem<strong>en</strong>tation plan, will be adopted by the GCR.The Authorities complete the staffing (with a priority forheads of clusters) of the Secretariat G<strong>en</strong>eral forCoordination (SGC), and set-up the training of its staff andof the coordination correspond<strong>en</strong>ts in the Ministries.The Authorities finalise the design of the procedures(regarding planning, coordination, control and monitoring,and preparation of arbitrages) the SGC is in charge of, andcomm<strong>en</strong>ce concrete operations on priorities.Complete the implem<strong>en</strong>tation of these procedures(regarding planning, coordination, control and monitoring,and preparation of arbitrages).July 2013July 2013September2013October 2013October 2013October 2013December20132.8 Avoiding waste and increasing quality through sound public procurem<strong>en</strong>t2.8.1.1 To make the Single Public Procurem<strong>en</strong>t Authority (SPPA) operationalThe SPPA <strong>en</strong>sures coordination and coher<strong>en</strong>ce of theMoU2.8.1.1.1functioning of the C<strong>en</strong>tral Purchasing Bodies, of thereform of the Greek public procurem<strong>en</strong>t regulations and ofthe e-procurem<strong>en</strong>t framework with the overall publicprocurem<strong>en</strong>t system and strategy.Continuous2.8.1.2 To increase the effici<strong>en</strong>cy of procurem<strong>en</strong>t processes:MoU2.8.1.2MoU2.8.1.2.1MoU2.8.1.2.2MoU2.8.1.2.3MoU2.8.1.2.4MoU2.8.1.2.5The Governm<strong>en</strong>t moves towards more c<strong>en</strong>tralisedprocurem<strong>en</strong>t, especially in the field of healthprocurem<strong>en</strong>t, services and supplies (including civilsupplies and services for def<strong>en</strong>ce not falling underthe scope of Directive 2009/81 on procurem<strong>en</strong>t in thefields of def<strong>en</strong>ce and security). It also startsbuilding a system of statistics in the field of procurem<strong>en</strong>t,uses framework contracts and reviews thepublic procurem<strong>en</strong>t legislation including works, suppliesand services. In particular the Governm<strong>en</strong>t:Agora PortalFollowing the adoption of the JMD on the Agora Portal forcontract transpar<strong>en</strong>cy, facilitates compliance, by reviewingstandard docum<strong>en</strong>ts and providing support to contractingAuthorities and eliminating overlap with other reportingobligations:The Governm<strong>en</strong>t publishes a set of standard forms forcontract notices based on those used to publish notices onEU T<strong>en</strong>ders Electronic Daily.ContinuousOctober 2013publishes all contract award notices and contracts. October 2013publishes consolidated data on the number of contractnotices on supplies, services and works and on the numberof contracting authorities uploading information on theportal (for contracts with value above 30.000€).publishes the findings of an indep<strong>en</strong>d<strong>en</strong>t evaluation of thefunctioning of the portal, including a review offunctionality and results (e.g. numbers of contractnotices/contract award notices published, numbers andtype of contracting authority, estimated values ofcontracts).C<strong>en</strong>tral Purchasing Bodies (CPB)ContinuousOctober 2013Revised draft legislation has be<strong>en</strong> submitted toEC/ECB/IMF.The actions scheduled for March-September 2013have be<strong>en</strong> initiated.Premises have be<strong>en</strong> located and funding has be<strong>en</strong>secured. The National Coordinator is supported in itsmission by the Coordination Committee and theAdvisory Body.The e-Gov Strategy completed and adopted by theGCR on 27/03/2014.The first round of staffing is almost completed andas for the second round the process is progressing.Two seminars are scheduled within November (thefirst round of seminars already took place).All procedures are designed and included in amanual, which is submitted to EC/ECB/IMF.Procedures are implem<strong>en</strong>ted according to the abovemanual.SPPA is the coordinator for the overall publicprocurem<strong>en</strong>t strategy of the Governm<strong>en</strong>t. Theimplem<strong>en</strong>tation of the e-procurem<strong>en</strong>t framework aswell as the legislative framework in g<strong>en</strong>eral areunder the compet<strong>en</strong>cy of SPPA.Improvem<strong>en</strong>ts based on the evaluation take place ona regular basis.The system covers the ted guidelines. E-s<strong>en</strong>dingsystem applies.According to EU and national regulatory framework,all contract award notices and contracts arepublished.Information are uploaded in portalwww.promitheus.gov.gr.The ministry proceeds with improvem<strong>en</strong>ts based onthe evaluation.Observed.Observed.Observed.NotObserved.Observed.Observed.Observed.Observed.Ongoing.Observed.Ongoing.Observed.Observed.Observed.Observed.94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!