12.07.2015 Views

ocp192_en

ocp192_en

ocp192_en

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEXΡar /ΡageMoU2.10.4.2.6.iiMoU2.10.4.2.7MoU2.10.5.1MoU2.10.5.2MoU2.10.5.3MoU2.10.5.4Action Deadline Comm<strong>en</strong>ts StatusDRGs will include a detailed item on costs of personnel.A follow up analysis of how hospital accounting schemesintegrate DRGs at hospital level in view of future activitybasedcost reporting and prospective budgets paym<strong>en</strong>t forhospitals will be submitted.The Governm<strong>en</strong>t increases substantially the number ofexp<strong>en</strong>diture items and therefore the share of exp<strong>en</strong>diturecovered by c<strong>en</strong>tralised t<strong>en</strong>der procedures through EPY upto 45% of all the exp<strong>en</strong>diture in medicines and medicaldevices by 2014. This share goes up to 60% in 2015. TheGovernm<strong>en</strong>t <strong>en</strong>sures the use of such t<strong>en</strong>der procedures.EPY will undertake t<strong>en</strong>der procedures for frameworkcontracts for the most exp<strong>en</strong>sive medicines sold inEOPYY pharmacies.EPY will publish a detailed annual report on its activityIn compliance with EU procurem<strong>en</strong>t rules, the Governm<strong>en</strong>tconducts the necessary t<strong>en</strong>dering procedures to implem<strong>en</strong>ta compreh<strong>en</strong>sive and uniform health care informationsystem (e-health system) including the full and integratedsystem of hospitals' IT systems.2.11 Upgrading the education systemMoU2.11.1MoU2.11.2MoU2.11.2.iMoU2.11.2.iiMoU2.11.2.iiiMoU2.11.3The Governm<strong>en</strong>t implem<strong>en</strong>ts the Action Plan for theimprovem<strong>en</strong>t of the effectiv<strong>en</strong>ess and effici<strong>en</strong>cy of theeducation system and regularly reports on the progress ofits implem<strong>en</strong>tation including on the results of the externalevaluation of high education institutions.On higher education, the provisions of the laws 4009/2011and 4076/2012 are fully and promptly implem<strong>en</strong>tedincluding:The external evaluation of the higher education institutionsby the Quality Assurance Authority is completed.The organisation charts and internal regulations of theHigher Education Institutions are completed.Update on the progress of the on-goingconsolidation/merging of departm<strong>en</strong>ts of universities andtechnological institutes (ATHINA Project).On primary and secondary education, the new policy ofevaluation of schools (including the schools' selfassessm<strong>en</strong>t)and educational staff starts beingimplem<strong>en</strong>ted.ContinuousSeptember2013ContinuousContinuous(2012 reportpublished inSeptember2013)ContinuousJune 2013December2013December2013March 2014September2013September2013An action plan has be<strong>en</strong> prepared by a specialworking group.The status of the DRGs implem<strong>en</strong>tation waspres<strong>en</strong>ted in September.Ongoing. Attempting ev<strong>en</strong> more t<strong>en</strong>der proceduresto be carried by EPY. Last report was submitted inFebruary 2013Ongoing. State Legal Council (NSK) provided thecons<strong>en</strong>t about the t<strong>en</strong>dering procedure. At the <strong>en</strong>d ofthe year and after completing the schedule for 2014needs, EPY will initiate t<strong>en</strong>ders that will coverEOPYY needs.EPY report was pres<strong>en</strong>ted and s<strong>en</strong>t for 2012 as wellas for 2013.Ongoing. Last progress report was submitted inFebruary 2013.Education Action Plan updated was submitted toEC/ECB/IMF (January 2014).Number of Departm<strong>en</strong>ts to be evaluated: 348.Evaluated: 326.Evaluation process is not applicable: 10 (due toInstitutes with no perman<strong>en</strong>t academic staff).Difficulty in setting up Evaluation Committees: 12,the process is expected to be completed by <strong>en</strong>d-April.Some universities make charts as pilot operation.The Ministry doesn't have interv<strong>en</strong>tion becauseuniversities are autonomous.It is expected that action will be completed by June2014.ATHINA project has be<strong>en</strong> fully in operation.The stud<strong>en</strong>t <strong>en</strong>tries to HEIs for the academic year2013-2014 were according to the new mapping.a) The self-assessm<strong>en</strong>t of schools has be<strong>en</strong> ext<strong>en</strong>dedto a national level since the school year 2013-2014according to 30972/Γ1/05.03.2013 (Governm<strong>en</strong>talGazette B 614 - 15.03.2013) Ministerial Decision.b) As for the assessm<strong>en</strong>t of teachers, a first cycle ofseminars concerning teacher training is beingdeveloped and will be funded by the NationalStrategic Refer<strong>en</strong>ce Framework.c) An Indep<strong>en</strong>d<strong>en</strong>t Ag<strong>en</strong>cy for the QualityAssurance of Primary and Secondary Education hasbe<strong>en</strong> founded by Law 4142 / Governm<strong>en</strong>tal Gazette83/09-04-2013.Observed.Ongoing.N/AN/AObserved.Observed.Ongoing.Observed.Ongoing.Observed.NotObserved.Observed.Observed.MoU2.11.3The first cycle of evaluation of the educational staff, inparticular School Directors, School Advisors and RegionalDirectors, is completed.3 Stabilising the Financial SystemDecember2013P.D. FEK 240/05.11.2013 on the evaluation ofeducational staff.The evaluation will begin in March and is expectedto be completed by early June, by the <strong>en</strong>d of schoolyear.Νew deadline in updated MoU.NotObserved.MoU3.1The governm<strong>en</strong>t <strong>en</strong>sures that no state aid will be granted tobanks before it is approved by the EC under state aid rules.ContinuousThe rule is applied continuously.Observed.Ongoing.3.1 Framework for restructuring and str<strong>en</strong>gth<strong>en</strong>ing of the banking systemThe Governm<strong>en</strong>t commits to invite HFSF to complete theMoU disposal of the two bridge-banks. The decision on the3.1.1Prior totransactions should take into consideration the publicMEFPdisbursem<strong>en</strong>t(24) interest, financial stability, as well as the protection ofHFSF assets.Eurobank acquired Proton Bank and Hell<strong>en</strong>ic PostBankObserved.101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!