13.07.2015 Views

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 164.4 FINAL DESIGN4.4.1 <strong>Design</strong> Analysis.Update the Final design analysis from the interim design to include descriptions of all design revisionsand/or developments. Provide final DA as a new document, not as addenda to the Interimdocument. Include the updated Fire Protection/Life Safety Code submittal with signatures.4.4.2 Drawings.Complete the final drawings to present a complete description of all the construction required andfully coordinate with other disciplines.• Provide an interior and exterior signage plan, schedules and details indicating the color,location and types of signs used on the project. Include the location and mounting informationfor the interior and exterior <strong>Army</strong> <strong>Reserve</strong> Minuteman plaques.• Landscape Plan. Projects will include a landscape plan where required by the projectscope. Typically, if the landscape is extensive, the plan is prepared by a registered landscapearchitect.4.4.3 Specifications.Provide a complete set of fully edited specifications from the listing given at the interim design.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- <strong>Part</strong> C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!