13.07.2015 Views

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 388.4.2 Drawings.g. Trade names are not allowed on the contract plans and specifications. However,for lighting fixtures and other equipment such as motor control centers,switchgear, bus duct, transformers (where special features are required), specialreceptacles, etc., Include the current manufacturer and catalog number of theequipment in the D.A.h. TV System <strong>Requirements</strong>.i. Lightning Protection Risk AssessmentComplete all of the previous submitted interim drawings, and all additional required drawings fora full design package.8.4.2.1 Details. Include all details for final package on drawings. For congested areas thatmight interfere with various electrical systems, cable trays, piping, ducts, etc.,thoroughly detail by expanded scale drawings.8.4.3 Specifications.Provide a complete set of fully edited specifications from the listing given at the interim design.8.4.3.1 References. Add publication references, paragraphs, and descriptions for items notadequately covered by specifications.8.4.3.2 Availability. Ascertain that major or special types of equipment are availablecommercially.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- <strong>Part</strong> C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!