13.07.2015 Views

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 14Utility Model – This model will show connection of new utilities from the building to the existingutilities. This model will also show all existing underground utilities along with all new and existingabove ground utilities.Road and Parking Model – This model will show roadway and parking lot facilities. Also existingground and utilities crossing will be indicated in this model.Master Site Model – This model will have all civil design models referenced in to create drawingextractions. All drawings shall be extracted form the BIM master model.b. DRAWING EXTRACTION REQUIREMENTSSee discipline specific requirements in <strong>Part</strong> C – <strong>Design</strong>/Build – <strong>Design</strong> <strong>Submittal</strong> <strong>Requirements</strong>After Award.4.1.2.3 FINAL SUBMITTALa. CIVIL MODELSThe Civil models may vary in level of detail for individual elements within a model, but at aminimum must include all features that would be included on an appropriately scaled drawing.Additional minimum requirements are listed below.Digital Terrain Model (DTM) – This model will show existing and new grading contours. Thismodel will also show all existing structures that are remaining. Indicate the new building(s),pavement, drainage inlets, structures, swales and/or detention areas.Drainage Model – This model will show existing and proposed new piping.Storm and Sanitary Model – This model will show sewer structures and pipes.Utility Model – This model will show connection of new utilities from the building to the existingutilities. This model will also show all existing underground utilities along all new and existingabove ground utilities.Road and Parking Model – This model will show roadway and parking lot facilities. Also existingground and utilities crossing will be indicated in this model.Master Site Model – this model will have all civil design models referenced in to create drawingextractions. All drawings shall be extracted form the BIM models.b. DRAWING EXTRACTION REQUIREMENTSSee discipline specific requirements in <strong>Part</strong> C – <strong>Design</strong>/Build – <strong>Design</strong> <strong>Submittal</strong> <strong>Requirements</strong>After Award.4.1.3 OTHER DISCIPLINES:Architectural, Structural, Interiors, Mechanical, and Electrical are to follow the requirementslisted in Appendix 3, Chapters 1 and 2.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- Appendix 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!