13.07.2015 Views

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 4standards, TriForma elements along with an explanation. Complete a quality check for compliancewith the A\E\C CADD standards on the final file condition prior to submittal and include theresults of that standard check in the submittal.<strong>Design</strong> Analysis - The model must support the design analysis when ever possible and prudent.That decision must be made by comparing the value of the output from the model versus the workadded to computer processing which is affected by the level of detail. If the project has a kitchen,then the information within the kitchen must be equivalent to data provided in cut sheet details.Drawings – Generate all drawings that contain information residing in the model from the BIM inthe extraction process. Standard details, index sheet, and other typical drawings need not be includedin the BIM.<strong>Part</strong> and Family Report – The model must support the <strong>Part</strong> and Families contained on the US<strong>Army</strong> <strong>Reserve</strong> Center BIM Dataset CD (Refer to Appendix 1 – BIM Work Instructions). Submita report that validates the parts and families of the BIM model.Interference Manager- Check the BIM models with Bentley's Interference Manager. Check the interferencesbetween structural, mechanical, and architectural models. Generate a report showingdesign team sign-offs for soft and hard interferences. Submit this report as part of the interim andfinal submittals. Also submit a Bentley Navigator file to highlight structural and mechanical interferences.1.5 AS-BUILT SUBMITTAL REQUIREMENTS1.5.1 SYSTEM MODELSThe As-Built models shall be complete and incorporate all modifications from the previous (As-Awarded) submittal that affect the models. Include with the submittals the extraction files, sheetfiles, special patterning, line styles, cells, reference files or other specific files used to create thedrawings as output of the model, and any modifications to the USARC BIM dataset.1.5.2 DRAWING EXTRACTION REQUIREMENTSUpdate all extractions to include any changes that occurred during construction.Also see discipline specific requirements in <strong>Part</strong> C – <strong>Design</strong>/Build – <strong>Design</strong> <strong>Submittal</strong> <strong>Requirements</strong>After Award.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- Appendix 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!