13.07.2015 Views

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

Army Reserve Design Process & Submittal Requirements Part C ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 40Chapter 10.0 – ENVIRONMENTAL10.1 GENERAL.10.1.1 REQUIREMENTSEnvironmental requirements are project and location specific, and could include site asbestos surveyand remediation planning, building asbestos survey and demolition, lead paint and environmentallead identification and remediation planning, radon assessment, reporting and abatementdesign, and a variety of other site and building environmental concerns,Refer to SECTION 01 02 00.00 48 – STATEMENT OF WORK, the Outline Specifications, andother portions of the Solicitation for the particular project environmental conditions and requirements.10.1.2 DESIGN CRITERIARefer to Chapter 1 "All Disciplines" above, paragraph: Reference Documents, and overall generalrequirements description.10.2 CHARRETTE DESIGN, INTERIM DESIGN, AND FINAL DESIGN10.2.1 <strong>Submittal</strong> <strong>Requirements</strong>.Refer to Chapter 1 "All Disciplines" above, paragraphs concerning the requirements at each submittalstate10.2.2 BIM <strong>Submittal</strong> <strong>Requirements</strong>Refer To Appendix 1– BIM Instructions, and Appendix 3 – BIM <strong>Submittal</strong> <strong>Requirements</strong> for <strong>Design</strong>Build.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- <strong>Part</strong> C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!