Page 6"Concur" response that is acceptable to Government may not receive furtherdiscussion at the meeting.1.7 FINAL DESIGN SUBMITTAL1.7.1 General.The final design submittal consists of a complete design required to build the project. It includesall completed drawings, fully edited specifications, and design analysis.1.7.2 Comments.Incorporate all approved interim submittal comments into the design.1.7.3 <strong>Submittal</strong> <strong>Requirements</strong>.(See also the discipline chapters for specific submittal requirements.)1.7.3.1 Specifications.a. Provide complete project specifications covering all disciplines and aspects of theproject.b. Required specifications origin and technical content shall be as called for inSection 01 02 00.00 48 – STATEMENT OF WORK, subparagraph"Specifications".c. Provide specifications in format as called for in Section 01 03 00.00 48 DESIGNSUBMISSIONS AFTER AWARD, paragraph "General <strong>Design</strong> <strong>Requirements</strong>",subparagraph "Specifications and reports."1.7.3.2 <strong>Design</strong> Analysisa. Provide narrative that is an expansion and elaboration by each discipline fromthat provided at interim design.b. Provide design calculations and supporting documentation to support the majortechnical design considerations. Calculations shall be computed and checked byseparate individuals, one of which must be a licensed professional in theassociated discipline. Supporting documentation shall be clear, and formulas andreferences shall be identified. Assumptions and conclusions shall be explainedand cross-referencing shall be clear. Provide as called for in the variousdiscipline chapters.c. Checking.1) All drawings and calculations are checked as required by the <strong>Design</strong> QualityControl Plan2) All review comments will be submitted and evaluated in Dr Checks.d. Cut sheets, product selections forming the basis of design: Clearly mark theselected product type or model intended to apply to the project. If the cut sheetsor brochures are standard printouts from manufacturer showing severalvariations, either mark/mark out to indicate just the selected product oraccompany the cut sheet with a cover sheet showing the applicable product.e. Cut sheets provided at the design stages are intended only to show the basis ofdesign, and are not shop drawings as called for in Section 01 33 00.10 06SUBMITTAL PROCEDURES FOR DESIGN/BUILD.f. Include as appendixed material all meeting minutes, and project-specificdocumentation such as asbestos and other hazmat reports.1 April 2007 Version <strong>Army</strong> <strong>Reserve</strong> DPSR Manual -- <strong>Part</strong> C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!