P974 Start Week<br />
This parameter will determine the week of the month (P975) in which<br />
Daylight Saving Time is to start.<br />
Option<br />
Description<br />
1= Week 1 DST will start on day (P973) in the first week<br />
(P974) of the month (P975).<br />
2= Week 2 DST will start on day (P973) in the second<br />
week (P974) of the month (P975).<br />
3= Week 3 DST will start on day (P973) in the third week<br />
(P974) of the month (P975).<br />
4= Week 4 DST will start on day (P973) in the fourth week<br />
(P974) of the month (P975).<br />
5= Last (Default) DST will start on day (P973) in the last week<br />
(P974) of the month (P975).<br />
P975 Start Month<br />
This parameter is used to select the month, in which Daylight Saving Time<br />
will start.<br />
Option<br />
Description<br />
1= January DST will start during the month of January<br />
2= February DST will start during the month of February<br />
3=March (Default) DST will start during the month of March<br />
4= April DST will start during the month of April<br />
5= May DST will start during the month of May<br />
6= June DST will start during the month of June<br />
7= July DST will start during the month of July<br />
8= August DST will start during the month of August<br />
9= September DST will start during the month of September<br />
10= October DST will start during the month of October<br />
11= November DST will start during the month of November<br />
12= December DST will start during the month of December<br />
P976 DST End Time<br />
This parameter is used to set the time of day at which Daylight Saving<br />
Time will end, the time is entered in the format HH: MM (24-hour format).<br />
Default = 02:00.<br />
Page 119