07.09.2015 Views

FlowCERT (UL)

UL manual - Pulsar Process Measurement

UL manual - Pulsar Process Measurement

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The fourth parameter, and fifth parameter, are set to determine the switch<br />

points, “ON” and “OFF” for the relay. See miscellaneous function table<br />

(P211, 221, 231, 241, 251) for further information.<br />

When P211, 221, 231, 241, 251 = 1 (Clock)<br />

P213, P223, P233, P243, P253 - Relay Setpoint 1<br />

Relay Setpoints are entered in Hours & Minutes (HH:MM) to set Time at which<br />

relay will energise. Default = 00:00 (HH:MM)<br />

P214, P224, P234, P244, P254 - Relay Setpoint 2<br />

Relay Setpoints are entered in Minutes to set Time Period that the relay will<br />

remain ON. Default = 0.00 mins.<br />

When P211, 221, 231, 241, 251 = 2 (Totaliser)<br />

P213, P223, P233, P243, P253 - Relay Setpoint 1<br />

Relay Setpoints are entered as a factor by which the on board totaliser (P820)<br />

should be multiplied by to provide a relay closure. Default = 0.00<br />

P214), P224, P234, P244, P254 - Relay Setpoint 2<br />

Relay Setpoints are entered in seconds to set the time period that the relay will<br />

remain ‘ON’. Default = 0.00 secs.<br />

Page 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!