Pump Duty<br />

Description<br />

8= First On First Off, The first pump switched on is the first<br />

alternate duty assist pump to be switched off, etc. regardless<br />

of the set points, so the setpoints are<br />

dynamically changed to enable this.<br />

9 = Service Ratio Standby When a service ratio duty is being used,<br />

on all other pumps in use, the standby<br />

pump can be started on a ratio basis<br />

only, when it will assume the setpoints<br />

of the next pump to start. The third<br />

setpoint (P215, 225, 235, 245, 255) is<br />

used to set the service ratio.<br />

10 = Two Pump Sets There are four pumps. Two rotate their<br />

start-up sequence with each other. If the<br />

two pumps cannot keep up, the level rise<br />

to the setpoints of the other two pumps<br />

which take over and rotate their<br />

sequence with each other.<br />

Important Information<br />

The pumps are started and stopped at the “ON” and “OFF” setpoints.<br />

To pump down (reduce level) then set “ON” higher than “OFF”. To<br />

pump up (increase level) then set “ON” lower than “OFF”.<br />

The third parameter for each relay determines the pump group. You can<br />

have two groups of pumps, and all similar duties within a group will operate<br />

together.<br />

P212, P222, P232, P242, P252 - Relay Pump Group<br />

By default, all pump groups are set to 1, but if you want to have another<br />

group, then set this parameter to 2, for each pump relay that should operate<br />

together as part of a second group.<br />