07.09.2015 Views

FlowCERT (UL)

UL manual - Pulsar Process Measurement

UL manual - Pulsar Process Measurement

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cable Entry<br />

There are 6 cable gland knock-outs on the base of the wall mount<br />

<strong>FlowCERT</strong> Lite (5 x 0.79" (20mm), 1 x 0.63" (16mm)) and 4 on the rear (4<br />

x 0.73" (18mm)). Select which ones you wish to use, and remove them by<br />

using a circular cutter, such as a tank cutter. Take care not to damage the<br />

circuit board inside while undertaking this. Do not use a hammer, as this<br />

may cause damage to the enclosure.<br />

It is recommended that you use suitable cable glands to ensure that the<br />

ingress rating is maintained and that they be tightened to the manufacturers<br />

recommended settings.<br />

Important Information<br />

All cable glands should be tightened to the manufacturer’s specifications.<br />

The terminal compartment cover screws should be tightened to 1.48lb<br />

in.(2Nm)<br />

Care should be taken not to over tighten the screws.<br />

Terminal Connection Details<br />

The terminal strip is as detailed below. There is also a wiring diagram inside<br />

the terminals access cover.<br />

Care should be taken not to over tighten the screws.<br />

Important Information<br />

All terminal connection screws should be tightened to 4.5in.lbs.<br />

(0.5Nm).<br />

Care should be taken not to over tighten the screws.<br />

Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!