FlowCERT (UL)
UL manual - Pulsar Process Measurement
UL manual - Pulsar Process Measurement
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The third parameter for each relay determines the assignment or<br />
condition of the relay, where required.<br />
When P211, 221, 231, 241, 251 = 2 (Step Time)<br />
If the relay is selected for Step Time, then this parameter is used to assign<br />
the relay to the 0 = Open condition (increase level) or 1 = Close condition<br />
(decrease level).<br />
The fourth parameter, fifth parameter and sixth parameter are set to<br />
determine the switch points, “ON” and “OFF” for the relay and where<br />
required the order of start. See control function, table (P211, 221, 231) for<br />
further information.<br />
When P211, 221, 231, 241, 251 =1 (Time)<br />
P213, P223, P233, P243, P253 Relay Setpoint 1<br />
This parameter determines the “Time Period ” that the relay will remain “ON”.<br />
Relay Setpoints are entered in Minutes.<br />
See the appropriate relay Function tables (P211, 221, 231, 241, 251) for further<br />
information.<br />
P214, P224, P234, P244, P254 Relay Setpoint 2<br />
This parameter determines the “Cycle Time ” for the operation of the relay.<br />
See the appropriate relay Function tables (P211, 221, 231, 241, 251) for further<br />
information.<br />
When P211, 221, 231, 241, 251 = 2 (Step Time)<br />
P213, P223, P233, P243, P253 Relay Setpoint 1<br />
Relay Setpoint 1 is entered in values of Measurement Units (P104)<br />
See the appropriate relay function tables (P211, 221, 231, 241, 251) for further<br />
information.<br />
P214, P224, P234, P244, P254 Relay Setpoint 2<br />
Relay Setpoints are entered in Seconds to set Drive Period, the time that the<br />
relay will remain ON<br />
See the appropriate relay Function tables (P211, 221, 231, 241, 251) for further<br />
information.<br />
Page 84