Project Area Recommendations<br />
Heritage House Landscape Improvements<br />
Project Area Priority Rankings<br />
Must-Do’s – Safety/Regulatory Items<br />
• Install concrete access ramps and sidewalks<br />
leading to the Heritage House<br />
• Ensure positive drainage away from buildings and<br />
outdoor gathering spaces<br />
Low-Cost, High-Impact Projects<br />
• Use volunteer hours to install new plant material,<br />
mulch , groundcover and edging<br />
• Install wooden white picket fencing, arbors and<br />
gates (as indicated on the design plan)<br />
• Collect oral history videos from Avila family<br />
members & package into movie format<br />
Medium & Large Projects<br />
• Remove existing asphalt alley and replace with<br />
raised community garden plots<br />
• Move large gazebo from Town Square parking lot,<br />
paint white and locate at eastern edge of<br />
Heritage House Event Lawn<br />
• Install irrigation system (drip heads to shrub beds<br />
and roter heads in Event Lawn)<br />
Medium & Large Projects (continued)<br />
• Contract with an artist to design a series of<br />
outdoor interpretive displays that document this<br />
history of the Avila family (migrant history,<br />
Hispanic American history) and the history of the<br />
Anna Flood House. Encourage the artist to use<br />
QR codes to link to recorded oral histories of the<br />
Avila family<br />
Estimated Total Project Cost<br />
(including 20% contingency):<br />
$273,466<br />
Chapter 3: Recommendations<br />
35