Project Area Recommendations<br />

Town Square Improvements<br />

Project Area Priority Rankings<br />

Must-Do’s – Safety/Regulatory Items<br />

• None<br />

Low-Cost, High-Impact Projects<br />

• Prior to construction of the Town Square<br />

improvements, the existing Town Square parking<br />

lots can be programmed for events and<br />

celebrations that activate the parking lot space<br />

(farmer’s market, concerts, etc)<br />

• Install streetscape furnishings (benches, trash,<br />

bike racks and planters) in the sidewalk area<br />

along the southern edge of the Town Square site<br />

• Contract to complete the 100% Construction<br />

Drawing set for the Town Square Improvements<br />

Medium & Large Projects<br />

• Install the large amphitheater structure and<br />

platform, including cutting into the blank brick<br />

façade of the Town Hall meeting room/cafeteria<br />

space and installing three sets of french doors<br />

that open up to the space to the outdoor<br />

amphitheater<br />

• Remove the existing asphalt from the drivethrough<br />

space, and install the specialty pavers,<br />

new curbs and bollards<br />

• Install Town Square project signage along the<br />

southern edge of the project area<br />

• Complete the bulk of the large-scale design<br />

improvements during one large construction<br />

project (this will ensure fewer construction<br />

disruptions)<br />

Estimated Total Project Cost<br />

(including 20% contingency):<br />

$616,064<br />

Chapter 3: Recommendations<br />

49